Back to bathroom remodel contractors
Builder Max Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2009 to Feb 2020
- Last 24 months
- 0 permits filed
44 permits since 2000: 39 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2018 | Completed final sign-off Mar 2018 | 78 Mars St | replace two vinyl windows with 2 (two) marvin wood windows as is no changes. replace 1 (one) bathroom window with 1 (one) milgard fiberglass bathroom window. bathroom window not visible from the street.Details
replace two vinyl windows with 2 (two) marvin wood windows as is no changes. replace 1 (one) bathroom window with 1 (one) milgard fiberglass bathroom window. bathroom window not visible from the street. | $11,000 |
| Jun 27, 2014 | Completed final sign-off Jul 2014 | 36 Day St | revision to appl #2013.0822.4977 - new layout of kitchen & bathrooms & closet partition.Details
revision to appl #2013.0822.4977 - new layout of kitchen & bathrooms & closet partition. | $15,000 |
| Aug 22, 2013 | Completed final sign-off Jul 2014 | 36 Day St | one (1) kitchen remodeling, (2) bathrooms remodeling, (2) window replacement - windows not facing street, deck repair less than 50%, overlay siding.Details
one (1) kitchen remodeling, (2) bathrooms remodeling, (2) window replacement - windows not facing street, deck repair less than 50%, overlay siding. | $50,000 |
| Sep 17, 2012 | Expired or cancelled expired Oct 2017 | 208 Hoffman Av | residential remodel including ground fl & 2nd flr. addition: new 2nd flr. bathroom, new 1st flr. living area & 1/2 bathrooms, interior lighting, plumbing & electrical work.Details
residential remodel including ground fl & 2nd flr. addition: new 2nd flr. bathroom, new 1st flr. living area & 1/2 bathrooms, interior lighting, plumbing & electrical work. | $160,000 |
| Oct 5, 2010 | Completed final sign-off Apr 2011 | 850 Joost Av | kitchen remodeling. new cabinets electrical, plumbing.bathroom remodeling:new plmg & elect fixtures tile.ground floor: partition walls,add shower,vanity to extg toilet.replace laundry utility sink, & move water heater to crawl space, add electric lights and outlets painting.Details
kitchen remodeling. new cabinets electrical, plumbing.bathroom remodeling:new plmg & elect fixtures tile.ground floor: partition walls,add shower,vanity to extg toilet.replace laundry utility sink, & move water heater to crawl space, add electric lights and outlets painting. | $34,000 |
| Oct 26, 2009 | Completed final sign-off Sep 2010 | 6 Divisadero St | in both units bathroom & kitchen remodel, electrical rewiring, remove & install new toilets (2), sinks (2), bathtubs (2), kitchen sinks (2) and 2 new furnaces.Details
in both units bathroom & kitchen remodel, electrical rewiring, remove & install new toilets (2), sinks (2), bathtubs (2), kitchen sinks (2) and 2 new furnaces. | $61,124 |