Build To Please
- Based in
- Sebastopol
- On San Francisco permits
- Jan 2013 to Sep 2015
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 1 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2014 | Completed final sign-off Feb 2015 | 54 San Jacinto Wy | revisioin to app#201301037112. delete portion of proposed deck.Details
revisioin to app#201301037112. delete portion of proposed deck. | |
| Sep 4, 2014 | Completed final sign-off Nov 2014 | 890 47th Av | #890c- replace existing kitchen sink cabinet, counter & sink. common area- replace (e) 2x4 deck joist which was overbored by others, replace cracked stair & tread & install graspable hand rails.Details
#890c- replace existing kitchen sink cabinet, counter & sink. common area- replace (e) 2x4 deck joist which was overbored by others, replace cracked stair & tread & install graspable hand rails. | $750 |
| Jun 9, 2014 | Completed final sign-off Nov 2014 | 890 47th Av | demolishion of 10x20-foot elevated connecting deck only to comply with nov 201471592.Details
demolishion of 10x20-foot elevated connecting deck only to comply with nov 201471592. | $3,900 |
| Jan 3, 2013 | Completed final sign-off Feb 2015 | 54 San Jacinto Wy | add 10'x42' deck @ second floor deck w/ steps to ground.Details
add 10'x42' deck @ second floor deck w/ steps to ground. | $12,000 |