Back to bathroom remodel contractors
Build-Tech Enterprises
- Based in
- Millbrae
- On San Francisco permits
- Jan 2005 to Jan 2006
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 261 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2005 | Completed final sign-off Mar 2006 | 76 Alvarado St | replace dryroted joist at rear 9 of building at 1st floor in kind. reframe dryrot reara wall on 1st and 2nd fls level in kind replace dry rotted siding in kind reframe second floor bathrooms in kind.Details
replace dryroted joist at rear 9 of building at 1st floor in kind. reframe dryrot reara wall on 1st and 2nd fls level in kind replace dry rotted siding in kind reframe second floor bathrooms in kind. | $8,500 |
| Jan 7, 2005 | Completed final sign-off Mar 2006 | 76 Alvarado St | remodel bath and kitchen. change existing windows, same size. stucco where needed for windows and drDetails
remodel bath and kitchen. change existing windows, same size. stucco where needed for windows and dr | $40,000 |