Build It Green General Contractor
- Based in
- Oakland
- On San Francisco permits
- May 2009 to Jul 2015
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2015 | Completed final sign-off Aug 2016 | 327 Precita Av | replace damaged stucco @ front of property. replace (6) windows @ front od property. hybrid alum ext. wood int. windows. replace stucco in kind, windows same size, same location, max u factor 0.32.Details
replace damaged stucco @ front of property. replace (6) windows @ front od property. hybrid alum ext. wood int. windows. replace stucco in kind, windows same size, same location, max u factor 0.32. | $5,000 |
| Jul 8, 2011 | Completed final sign-off Sep 2011 | 207 Day St | move 1 wall (closet) and build new bathroom in area between bedrooms, water closet toilet and shower and new skylightDetails
move 1 wall (closet) and build new bathroom in area between bedrooms, water closet toilet and shower and new skylight | $22,000 |
| Jul 7, 2011 | Completed final sign-off Oct 2011 | 424 College Av | interior remodel of existing kitchen/breakfast room with new wall opening to living room and replacement doorway to dining room, related structural at gr floor. 4 replacement windows at kitchen.Details
interior remodel of existing kitchen/breakfast room with new wall opening to living room and replacement doorway to dining room, related structural at gr floor. 4 replacement windows at kitchen. | $17,950 |
| Jun 17, 2011 | Completed final sign-off Oct 2011 | 1349 Page St | new kitchen cabinets reposition, kitchen sink, add additional lighting & outlets.Details
new kitchen cabinets reposition, kitchen sink, add additional lighting & outlets. | $22,000 |
| Apr 19, 2011 | Completed final sign-off Feb 2012 | 557 Duboce Av | replace 1 story rear yard deck by stairs.Details
replace 1 story rear yard deck by stairs. | $9,000 |
| Mar 30, 2011 | Completed final sign-off May 2011 | 26 Roanoke St | replace/repair window trim, flashing @ 2 exterior window which have demonstrated leaking during rainy monthsDetails
replace/repair window trim, flashing @ 2 exterior window which have demonstrated leaking during rainy months | $1,350 |
| Mar 21, 2011 | Completed final sign-off May 2011 | 424 Texas St | replace kitchen cabinets & paint exterior. no structural work and new lighting comply cec 150 (k). field inspector to field verify construction cost because customer said the cost is lower.Details
replace kitchen cabinets & paint exterior. no structural work and new lighting comply cec 150 (k). field inspector to field verify construction cost because customer said the cost is lower. | $4,000 |
| Feb 5, 2010 | Completed final sign-off Aug 2010 | 557 Duboce Av | replace roof on dormer 3rd. flr. both, patio roof dining rm. small roof in light well.Details
replace roof on dormer 3rd. flr. both, patio roof dining rm. small roof in light well. | $3,500 |
| Jan 7, 2010 | Completed final sign-off Aug 2010 | 557 Duboce Av | renovate existing bathrooms at 2nd and 3rd floors. no structural work.Details
renovate existing bathrooms at 2nd and 3rd floors. no structural work. | $14,000 |
| May 18, 2009 | Completed final sign-off May 2009 | 26 Roanoke St | reduce scope of work, requesting revision to permit. the upstairs work was not done to the original plans. work was performed to revise plans. revision to 2008/0715/6755.Details
reduce scope of work, requesting revision to permit. the upstairs work was not done to the original plans. work was performed to revise plans. revision to 2008/0715/6755. |