Permit GraphShortlistSan Francisco building permits since 2000

Build And Design Construction

Contractor license
795714
State license record
Based in
San Francisco
On San Francisco permits
Aug 2010 to Oct 2023
Last 24 months
0 permits filed

10 permits since 2000: 5 completed, 4 never finaled, 1 expired or cancelled.

Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Bathroom remodel permits

AllKitchen remodel 3Bathroom remodel 3

3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 130 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Oct 13, 2023Completed
final sign-off Mar 2024
340 Magellan Avbathroom: replacing fixtures and titles, removing non-structural wall, replacing 9 windows for damage max u-factor = 0.30 (3 on front of house and 6 on side) in kind to repair storm damage, replacing front step walkway due to storm damage, roughly 50% to waterproof and replace in kind
Details
Permit
202310138638
Permit issued
Oct 13, 2023
Final sign-off
Mar 14, 2024

bathroom: replacing fixtures and titles, removing non-structural wall, replacing 9 windows for damage max u-factor = 0.30 (3 on front of house and 6 on side) in kind to repair storm damage, replacing front step walkway due to storm damage, roughly 50% to waterproof and replace in kind

Open the permit page

$140,000
Dec 31, 2019Never finaled
issued Dec 2019, no final
2208 Steiner Stremove downstairs bathroom, plumbing, & electrical. replace shower fixtures in upstairs bathroom.
Details
Permit
201912311073
Permit issued
Dec 31, 2019

remove downstairs bathroom, plumbing, & electrical. replace shower fixtures in upstairs bathroom.

Open the permit page

$18,500
Nov 19, 2019Completed
final sign-off Mar 2020
674 43rd Avremodel bathrom: relace new plumbing and electrival fixtures. repalce walls and lfoor with new tile in bathroom.
Details
Permit
201911197661
Permit issued
Nov 19, 2019
Final sign-off
Mar 4, 2020

remodel bathrom: relace new plumbing and electrival fixtures. repalce walls and lfoor with new tile in bathroom.

Open the permit page

$18,000