Back to bathroom remodel contractors
Build 4 Less Construction Inc
- Based in
- Los Angeles
- On San Francisco permits
- Jun 2014 to Feb 2017
- Last 24 months
- 0 permits filed
14 permits since 2000: 7 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 2 completed, 3 never finaled. Typically 0 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 14, 2017 | Completed final sign-off May 2017 | 215 Oak Park Dr | addition of bathroom and playroom at garage levelDetails
addition of bathroom and playroom at garage level | $30,000 |
| Feb 17, 2016 | Never finaled issued Feb 2016, no final | 4095 Folsom St | rewire entire house, plumbing for dishwasher and sink in kitchen island. remove non bearing wall, propose dsl beam - see drawing. replace plumbing fixture on bathroomDetails
rewire entire house, plumbing for dishwasher and sink in kitchen island. remove non bearing wall, propose dsl beam - see drawing. replace plumbing fixture on bathroom | $5,000 |
| Jan 21, 2016 | Never finaled issued Jan 2016, no final | 1333 Jones St | remove existing counter top and replace new counter top and cabinet in kitchen. remove plumbing fixture on bath and replace new. n/a maher ord. 155-13Details
remove existing counter top and replace new counter top and cabinet in kitchen. remove plumbing fixture on bath and replace new. n/a maher ord. 155-13 | $8,000 |
| Nov 18, 2014 | Completed final sign-off May 2015 | 714 23rd Av | bathroom remodel like for like. replace toilet, vanity double sink, add 5 recessed lights, add 6 recessed lights in kitchen. rewire for the whole house. upgrade panel (200 amp).Details
bathroom remodel like for like. replace toilet, vanity double sink, add 5 recessed lights, add 6 recessed lights in kitchen. rewire for the whole house. upgrade panel (200 amp). | $12,000 |
| Jun 10, 2014 | Never finaled issued Jun 2014, no final | 444 04th Av | #444- kitchen & bathroom remodeling, electrical.Details
#444- kitchen & bathroom remodeling, electrical. | $18,500 |