Buestad Construction Inc
- Based in
- Alameda
- On San Francisco permits
- May 2011 to Mar 2025
- Last 24 months
- 1 permit filed
7 permits since 2000: 5 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2025 | In progress issued Mar 2025 | 169 Avila St | 2nd/fl: enlarge primary bath enlarge laundry/utility room, convert bedroom 2 into primary closet, add 2 new skylights, bath#2: remove existing bath fixtures and replace with a new showerDetails
2nd/fl: enlarge primary bath enlarge laundry/utility room, convert bedroom 2 into primary closet, add 2 new skylights, bath#2: remove existing bath fixtures and replace with a new shower | $90,000 |
| Jan 31, 2014 | Completed final sign-off Jan 2016 | 2255 Octavia St | new stacked washer and dryer at 2nd floor.n/a for the maher ordinance #155-13Details
new stacked washer and dryer at 2nd floor.n/a for the maher ordinance #155-13 | $2,000 |
| Dec 6, 2013 | Never finaled issued Dec 2013, no final | 1550 Page St | repair to roof framing due to fire danage and replacement of composition shingle roof and sheet metal gutters. all work in kind and finishes to match existing. no modifications to facias etc. replace/repair 6 windows in kindDetails
repair to roof framing due to fire danage and replacement of composition shingle roof and sheet metal gutters. all work in kind and finishes to match existing. no modifications to facias etc. replace/repair 6 windows in kind | $50,000 |
| Sep 10, 2013 | Completed final sign-off Feb 2014 | 2033 Jefferson St | remodel of (e) kitchen on 2nd floor of single family residence.Details
remodel of (e) kitchen on 2nd floor of single family residence. | $15,000 |
| Jul 29, 2013 | Completed final sign-off Jun 2014 | 2255 Octavia St | master suite remodel includng master bath with new window, powder room remodel. new wood windows and door to terrace, new fire place surround at living room and other misc. improvements.Details
master suite remodel includng master bath with new window, powder room remodel. new wood windows and door to terrace, new fire place surround at living room and other misc. improvements. | $75,000 |
| May 8, 2013 | Completed final sign-off Jul 2013 | 685 07th St | minor remodel of back o fhouse areas on basement, 1st & 2nd floor. relocate partions & add walls, minor changes to light fixtures. no exterior work.Details
minor remodel of back o fhouse areas on basement, 1st & 2nd floor. relocate partions & add walls, minor changes to light fixtures. no exterior work. | $13,000 |
| May 27, 2011 | Completed final sign-off Feb 2013 | 30 Chattanooga St | rebuild extg concrete stair to basement as int. carpeted stair to the extended part of extg family room. adjacent to include 2 relocated windows and 2 new skylights (flat). remodel cased opening over sink where window removed. reposition 2 of 4 extg can lights in family room.Details
rebuild extg concrete stair to basement as int. carpeted stair to the extended part of extg family room. adjacent to include 2 relocated windows and 2 new skylights (flat). remodel cased opening over sink where window removed. reposition 2 of 4 extg can lights in family room. | $55,000 |