Bud Owings
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Aug 2021
- Last 24 months
- 0 permits filed
15 permits since 2000: 14 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2021 | Completed final sign-off Sep 2021 | 366 Valdez Av | replace windows (4) on front of house and 3 side windows: replace in kind, same location, same paint.Details
replace windows (4) on front of house and 3 side windows: replace in kind, same location, same paint. | $12,000 |
| Mar 22, 2016 | Completed final sign-off Jun 2017 | 516 Chenery St | horizontal rear yard addition to include 1/2 bath.Details
horizontal rear yard addition to include 1/2 bath. | $30,000 |
| Nov 25, 2014 | Completed final sign-off Feb 2015 | 16 Ord Ct | kitchen remodel, 8'x20'. change out cabinets & counter top. no structural work, walls remain existing. all appliances remain in existing locations.Details
kitchen remodel, 8'x20'. change out cabinets & counter top. no structural work, walls remain existing. all appliances remain in existing locations. | $8,000 |
| Sep 13, 2013 | Completed final sign-off Sep 2013 | 2277 Washington St | repair deck railing outside #2 at rear. repair & replace in kind.Details
repair deck railing outside #2 at rear. repair & replace in kind. | $1,500 |
| Aug 21, 2012 | Completed final sign-off Aug 2012 | 3850 25th St | install handrails. rear stairways. maintain extg width.Details
install handrails. rear stairways. maintain extg width. | $550 |
| Apr 27, 2011 | Completed final sign-off Jun 2011 | 4097 19th St | comply with nov#201121962, dated 4/19/2011. repair dry-rot on stairs. strap w/h, clean debris from storage, remove wood ladder.Details
comply with nov#201121962, dated 4/19/2011. repair dry-rot on stairs. strap w/h, clean debris from storage, remove wood ladder. | $1,200 |
| Apr 7, 2011 | Completed final sign-off Jun 2011 | 779 Guerrero St | work on #779 only -to comply with nov# 201116301 remodel kitchen & bath, all work replace in kind, new kiten cabinet,countertop. bath: new tub/vanity/toilet. all walls/doors stay the same, paint. elec & plumbing under seperate permit.Details
work on #779 only -to comply with nov# 201116301 remodel kitchen & bath, all work replace in kind, new kiten cabinet,countertop. bath: new tub/vanity/toilet. all walls/doors stay the same, paint. elec & plumbing under seperate permit. | $18,000 |
| Sep 7, 2010 | Completed final sign-off Sep 2010 | 45 Wilder St | comply with physical inspection report #cc-5786Details
comply with physical inspection report #cc-5786 | $1,200 |
| Feb 12, 2009 | Completed final sign-off Sep 2009 | 1328 Castro St | remodel existing condo. relocate kitchen and bedroom, open wall to enlarge new kitchen/liv/din rm, remodel bath at e location, remove shower, add w/dDetails
remodel existing condo. relocate kitchen and bedroom, open wall to enlarge new kitchen/liv/din rm, remodel bath at e location, remove shower, add w/d | $20,000 |
| Oct 6, 2008 | Completed final sign-off Mar 2009 | 301 Arlington St | comply with physical inspection report# 3r-4916 for item# 1, 5 & 7.Details
comply with physical inspection report# 3r-4916 for item# 1, 5 & 7. | $1,500 |
| Feb 21, 2007 | Completed final sign-off Jun 2007 | 1326 Castro St | comply partially with physical inspection report 3r-4645.Details
comply partially with physical inspection report 3r-4645. | $5,000 |
| Feb 28, 2006 | Completed final sign-off Feb 2016 | 552 Hill St | renew pa# 2005/03/28/8499, pa# 2005/05/31/3771 & pa# 2004/05/05/3052 to complete work.Details
renew pa# 2005/03/28/8499, pa# 2005/05/31/3771 & pa# 2004/05/05/3052 to complete work. | $5,001 |
| Feb 28, 2006 | Completed final sign-off Sep 2017 | 552 Hill St | renew pa# 2004/03/01/7431, pa# 2004/02/11/6132 /7 pa# 2003/12/31/3258 for final inspection.Details
renew pa# 2004/03/01/7431, pa# 2004/02/11/6132 /7 pa# 2003/12/31/3258 for final inspection. | |
| May 31, 2005 | Never finaled issued May 2005, no final | 552 Hill St | install 3 heaters (elec) in basement unit. revision to pa 200405053052Details
install 3 heaters (elec) in basement unit. revision to pa 200405053052 | $500 |
| Mar 28, 2005 | Completed final sign-off Feb 2016 | 552 Hill St | renew 200312313258 & 200405053052 for remainder of work.Details
renew 200312313258 & 200405053052 for remainder of work. | $13,000 |