Back to bathroom remodel contractors
Buchmann General Building
- Based in
- Castro Valley
- On San Francisco permits
- Jan 2017 to May 2026
- Last 24 months
- 2 permits filed
9 permits since 2000: 7 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2022 | Completed final sign-off Jun 2023 | 301 Nevada St | two bath remodel in kind @ groundfl: demo (e) tiles, vanity, plumbing, shower enclosures, electrical fixture. add (2) shower lights, install 1 wall mounted toilet, add new shower fixtures, add new mirrors and shower enclosures, add new wall and floor tiles, add new light fixture in place of old one.Details
two bath remodel in kind @ groundfl: demo (e) tiles, vanity, plumbing, shower enclosures, electrical fixture. add (2) shower lights, install 1 wall mounted toilet, add new shower fixtures, add new mirrors and shower enclosures, add new wall and floor tiles, add new light fixture in place of old one. | $20,000 |
| Mar 16, 2021 | Completed final sign-off Sep 2021 | 301 Nevada St | one bath remodel: demolish(e)tiles,vanity,plumbing,shower enclosure,electrical fixtures.add outlets for elctrical towel warmer,toto washlet,radient heat floor,2 shower lights, install wall toilet,change single vanity to dual,new shower fixtures,retile,floor and walls add new mirrors and shower encloDetails
one bath remodel: demolish(e)tiles,vanity,plumbing,shower enclosure,electrical fixtures.add outlets for elctrical towel warmer,toto washlet,radient heat floor,2 shower lights, install wall toilet,change single vanity to dual,new shower fixtures,retile,floor and walls add new mirrors and shower enclo | $20,000 |