Back to bathroom remodel contractors
Bryant Sams
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Feb 2024
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 217 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 6, 2019 | Never finaled issued Jan 2020, no final | 742 Holloway Av | 1st floor: remodel kitchen, bathroom and bedrooms. add living and half bath. 2nd floor: remodel kitchen, bathroom and dining. add 1 bath and infill lightwell. new deck at rear. new windows at front with aluminum clad woodDetails
1st floor: remodel kitchen, bathroom and bedrooms. add living and half bath. 2nd floor: remodel kitchen, bathroom and dining. add 1 bath and infill lightwell. new deck at rear. new windows at front with aluminum clad wood | $60,000 |