Back to bathroom remodel contractors
Brus Box Contractor Works
- Based in
- Daly City
- On San Francisco permits
- Aug 2025 to Jun 2026
- Last 24 months
- 5 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2026 | Completed final sign-off Aug 2026 | 1458 34th Av | in kind bathroom remodel except tub to shower, to include demo, rough plumbing and electric, drywall replacement and fixtures and finishes. convert bathtub into shower. no wall removal or layout change. approx 65 sq ft.Details
in kind bathroom remodel except tub to shower, to include demo, rough plumbing and electric, drywall replacement and fixtures and finishes. convert bathtub into shower. no wall removal or layout change. approx 65 sq ft. | $35,000 |
| Aug 6, 2025 | Completed final sign-off Oct 2025 | 2034 Greenwich St | bath remodel 2nd fl: demolition of bathtub, tile and vanity and fixtures. install shower, shower pan, shower doors, tiling, light fixtures.Details
bath remodel 2nd fl: demolition of bathtub, tile and vanity and fixtures. install shower, shower pan, shower doors, tiling, light fixtures. | $17,750 |