Back to bathroom remodel contractors
Bruce Construction Inc.
- Based in
- San Bruno
- On San Francisco permits
- Feb 2014 to Aug 2017
- Last 24 months
- 0 permits filed
21 permits since 2000: 20 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 14 completed. Typically 0 days from filing to permit and 83 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2017 | Completed final sign-off Jan 2018 | 2201 North Point St | remodel both kitchen and bathroom. remove and replace all fixtures, cabinets, and surfaces and bring all electrical and plumbing into code compliance. no walls moved. no windows changed. n/a maherDetails
remodel both kitchen and bathroom. remove and replace all fixtures, cabinets, and surfaces and bring all electrical and plumbing into code compliance. no walls moved. no windows changed. n/a maher | $50,000 |
| Oct 20, 2016 | Completed final sign-off Nov 2017 | 50 Lansing St | r/r tub , tile surround, tile floor and showr valve in guest bathroom. remove interior sliding doors and repalce with pocket doors. r/r fireplace inserts. add framing to accomdodate with new insert.Details
r/r tub , tile surround, tile floor and showr valve in guest bathroom. remove interior sliding doors and repalce with pocket doors. r/r fireplace inserts. add framing to accomdodate with new insert. | $15,000 |
| Jul 20, 2016 | Completed final sign-off Feb 2017 | 270 Delano Av | remodel bathroom: remove tub & replace with shower. update plumbing to code including new waste & supply lines & fixctures. update elect. to code includ new led lights. new fan, new iwring. window in lightwell replacement, not visiable from street; fiberglass.Details
remodel bathroom: remove tub & replace with shower. update plumbing to code including new waste & supply lines & fixctures. update elect. to code includ new led lights. new fan, new iwring. window in lightwell replacement, not visiable from street; fiberglass. | $20,000 |
| May 19, 2016 | Completed final sign-off Jun 2016 | 1708 Lombard St | lower unit - remodel 1/2 bath, remove tub & tile & replace with cultured marble pan & walls, update elect incl fan & plumbing as needed.Details
lower unit - remodel 1/2 bath, remove tub & tile & replace with cultured marble pan & walls, update elect incl fan & plumbing as needed. | $18,000 |
| Apr 4, 2016 | Completed final sign-off Jun 2016 | 31 Gladeview Wy | remodel (2) bathrooms, fan in each bath, replace all fixctures in same locations. replace tile. update plumbing & electrical as needed.Details
remodel (2) bathrooms, fan in each bath, replace all fixctures in same locations. replace tile. update plumbing & electrical as needed. | $30,000 |
| Mar 29, 2016 | Completed final sign-off May 2016 | 2563 39th Av | remodel existing bathroom including new fixtures and wall cover, upgrade plumbing and electrical. all work in kind.Details
remodel existing bathroom including new fixtures and wall cover, upgrade plumbing and electrical. all work in kind. | $17,000 |
| Mar 7, 2016 | Completed final sign-off Apr 2016 | 289 Hermann St | remove & replace all fixts & surfaces in bathroom. update plumbing & electrical to current code standards.Details
remove & replace all fixts & surfaces in bathroom. update plumbing & electrical to current code standards. | $18,000 |
| Dec 22, 2015 | Completed final sign-off Mar 2016 | 1374 Grove St | remodel bathroom including new tile and fixtures, bring plumbing and electrical up to code. repair and replace dry rot found.Details
remodel bathroom including new tile and fixtures, bring plumbing and electrical up to code. repair and replace dry rot found. | $20,000 |
| Aug 28, 2015 | Completed final sign-off Nov 2015 | 100 Burlwood Dr | full kitchen and bath remodel. new cabinets, fixtures, floors etc. upgrade elec and plumbing systems for code complianceDetails
full kitchen and bath remodel. new cabinets, fixtures, floors etc. upgrade elec and plumbing systems for code compliance | $50,000 |
| Dec 17, 2014 | Completed final sign-off Feb 2016 | 1680 Plymouth Av | remodel 2 baths, upgrade plumbing and elec as required by code. exhaust per cmc 403.27 3' frm pl and openings into bldg per cmc 504.5 lighting per cec 150 ckDetails
remodel 2 baths, upgrade plumbing and elec as required by code. exhaust per cmc 403.27 3' frm pl and openings into bldg per cmc 504.5 lighting per cec 150 ck | $30,000 |
| Aug 11, 2014 | Completed final sign-off Sep 2014 | 432 Funston Av | bathroom remodel incl. to replace 2 windows in the bathroom, facing lightwell, replace bathtub, toilet, & lavatoyr. repiar dryrot. u- factor .4; to comply with cec150.0(k)5Details
bathroom remodel incl. to replace 2 windows in the bathroom, facing lightwell, replace bathtub, toilet, & lavatoyr. repiar dryrot. u- factor .4; to comply with cec150.0(k)5 | $15,000 |
| Aug 11, 2014 | Completed final sign-off Sep 2014 | 430 Funston Av | replace 2 windws facing lghtwell, bathroom remodel, incl. replacing bathtub, toilet, & lavatory. upgrade all plumbing & electrical. u factor .4; to comply with cec 150.0(k)5; dry rot in bathroomDetails
replace 2 windws facing lghtwell, bathroom remodel, incl. replacing bathtub, toilet, & lavatory. upgrade all plumbing & electrical. u factor .4; to comply with cec 150.0(k)5; dry rot in bathroom | $15,000 |
| Mar 26, 2014 | Completed final sign-off May 2014 | 19 Gladeview Wy | removel 2nd bathroom, rmeove and replace fixtures, tile, drywall. update plumbing and electrical as needed.Details
removel 2nd bathroom, rmeove and replace fixtures, tile, drywall. update plumbing and electrical as needed. | $22,000 |
| Feb 10, 2014 | Completed final sign-off May 2014 | 19 Gladeview Wy | remodel one bathroom, including new fixtures, new tile, replace skylight, upgrade plumbing & electrical as needed.Details
remodel one bathroom, including new fixtures, new tile, replace skylight, upgrade plumbing & electrical as needed. | $20,000 |