Back to bathroom remodel contractors
Bruce Construction
- Based in
- San Bruno
- On San Francisco permits
- Mar 2006 to Jan 2014
- Last 24 months
- 0 permits filed
64 permits since 2000: 57 completed, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 21 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 81 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 2, 2014 | Completed final sign-off Feb 2014 | 2687 37th Av | remodel bathroom including new plumbing fixtures, new cultured marble shower, new drywall, new gfci outlet, repair dry rot as necessary.Details
remodel bathroom including new plumbing fixtures, new cultured marble shower, new drywall, new gfci outlet, repair dry rot as necessary. | $20,000 |
| Oct 18, 2012 | Completed final sign-off Jan 2013 | 1938 33rd Av | remove & replace bathroom plumbing fixtures in one bathroom. remove & replace tile shower & floor with cultured marble. move furnace duct work in kitchen flue if possible to allow removal of flue chase. this work is to be done on 2nd floor.Details
remove & replace bathroom plumbing fixtures in one bathroom. remove & replace tile shower & floor with cultured marble. move furnace duct work in kitchen flue if possible to allow removal of flue chase. this work is to be done on 2nd floor. | $6,000 |
| Feb 13, 2012 | Completed final sign-off Apr 2012 | 2563 39th Av | remodel ground floor bathroom and bedroom, new plumbing fixtures, new tile, new drywall & insul. upgrade plumbing & electrical per code. replace existing patio door in existing opening from bedroom to backyard. (in kind).Details
remodel ground floor bathroom and bedroom, new plumbing fixtures, new tile, new drywall & insul. upgrade plumbing & electrical per code. replace existing patio door in existing opening from bedroom to backyard. (in kind). | $20,000 |
| Oct 3, 2011 | Completed final sign-off Nov 2011 | 3535 Divisadero St | remodel bathroom, remove and replace plumbing and electrical fixtures. update plumbing and electrical as needed. remove & replace 4 windows, no change on walls & openings. 2 front windows paintable fiberglass, back window vinyl.Details
remodel bathroom, remove and replace plumbing and electrical fixtures. update plumbing and electrical as needed. remove & replace 4 windows, no change on walls & openings. 2 front windows paintable fiberglass, back window vinyl. | $10,000 |
| Jul 5, 2011 | Completed final sign-off Aug 2011 | 277 Hermann St | remodel bathroom, including r & r bathtub, tile, etc. update plumbing & electrical as necessary, replace all plumbing fixtures, replace one existing lightwell window in kind, (e) sash to remain.Details
remodel bathroom, including r & r bathtub, tile, etc. update plumbing & electrical as necessary, replace all plumbing fixtures, replace one existing lightwell window in kind, (e) sash to remain. | $20,000 |
| Nov 24, 2010 | Completed final sign-off Jan 2011 | 1354 26th Av | remove and replace floor covering, walls covering and ceiling in bathroom, remove and replace fixtures, update electrical ; provide high efficacy lights or manual on occupany sensorsDetails
remove and replace floor covering, walls covering and ceiling in bathroom, remove and replace fixtures, update electrical ; provide high efficacy lights or manual on occupany sensors | $10,000 |
| Nov 9, 2010 | Completed final sign-off Sep 2011 | 318 Hearst Av | to comply with nov.#200920441. legalize (e) storage room & bathroom removal dtd. 9-20-10Details
to comply with nov.#200920441. legalize (e) storage room & bathroom removal dtd. 9-20-10 | $5,000 |
| Sep 21, 2010 | Completed final sign-off Nov 2010 | 1685 Plymouth Av | remodel bathroom, remove & replace bathtub, pedestal sink and toilet. update plumbing and electrical as necessaryDetails
remodel bathroom, remove & replace bathtub, pedestal sink and toilet. update plumbing and electrical as necessary | $10,000 |
| Aug 20, 2009 | Completed final sign-off Oct 2009 | 1691 25th Av | remove existing bedroom & bathroom from garage. construct new bedroom & bathroom in garage. update electrical & plumbing; level existing slab with 3"-5" of new concrete over existing slab.Details
remove existing bedroom & bathroom from garage. construct new bedroom & bathroom in garage. update electrical & plumbing; level existing slab with 3"-5" of new concrete over existing slab. | $50,000 |
| Apr 30, 2009 | Completed final sign-off Jul 2009 | 468 42nd Av | remodel bathroom. remove & replace bathtub, shower, toilet, 2 windows (lightwell) wooden windows, tile, fixtures & faucets, vanity cabinet, doors, drywall, insulation, plumbing & electrical.Details
remodel bathroom. remove & replace bathtub, shower, toilet, 2 windows (lightwell) wooden windows, tile, fixtures & faucets, vanity cabinet, doors, drywall, insulation, plumbing & electrical. | $25,000 |
| Mar 28, 2008 | Completed final sign-off Jul 2008 | 44 Vulcan Sw | remodel bathroom, incl replac shower pan & tile walls, replace toilet, countertop, lavatory, floor cover (tile to granite). update electrical and paint walls and ceiling. dry wall patch adn dryrot repair as necessary. electrical and plumbing under separate permits.Details
remodel bathroom, incl replac shower pan & tile walls, replace toilet, countertop, lavatory, floor cover (tile to granite). update electrical and paint walls and ceiling. dry wall patch adn dryrot repair as necessary. electrical and plumbing under separate permits. | $20,000 |
| Jan 29, 2008 | Completed final sign-off May 2008 | 28 Roselyn Tr | remodel bathroom. remove and replace vanity, sink , toilet, tile floor, shower surround. upgdate plumbing and electrical. provide fluorescent light or occupancy sensors in bathroom. provide an exhaust fan w/ bd.d. terminating min 3' from opening/ pl.Details
remodel bathroom. remove and replace vanity, sink , toilet, tile floor, shower surround. upgdate plumbing and electrical. provide fluorescent light or occupancy sensors in bathroom. provide an exhaust fan w/ bd.d. terminating min 3' from opening/ pl. | $28,000 |
| Oct 11, 2007 | Completed final sign-off Jan 2008 | 1863 22nd Av | replace dryrot damaged framing as part of bathroom remodel. update plumbing & electrical as needed to bring into code compliance. replace all fixtures. revision to pa#200710034457.Details
replace dryrot damaged framing as part of bathroom remodel. update plumbing & electrical as needed to bring into code compliance. replace all fixtures. revision to pa#200710034457. | $5,000 |
| Aug 20, 2007 | Completed final sign-off Oct 2007 | 3535 Divisadero St | remodel bathroom & adjacent 1/2 bathroom. reframe shower wall same location in main bathroom. remove & replace 2 toilets, 2 vanities & faucets & 1 shower. remove 2 windows in lightwell & replace with dual glaze vinyl windows (min u 0.67) can't be seen from street. same size & location. reframeDetails
remodel bathroom & adjacent 1/2 bathroom. reframe shower wall same location in main bathroom. remove & replace 2 toilets, 2 vanities & faucets & 1 shower. remove 2 windows in lightwell & replace with dual glaze vinyl windows (min u 0.67) can't be seen from street. same size & location. reframe | $28,000 |
| Jun 19, 2007 | Completed final sign-off Jan 2008 | 1863 22nd Av | new deck and stairs at rear. 1 kitchen and 1 bathroom remodel. all cabinets,fixtures, appliances, drywall. update plumbing and elec. no structural work.replace headers at 3 openings in lightwell with new 4x12. 2 doors and 1 window to be permanent openings.Details
new deck and stairs at rear. 1 kitchen and 1 bathroom remodel. all cabinets,fixtures, appliances, drywall. update plumbing and elec. no structural work.replace headers at 3 openings in lightwell with new 4x12. 2 doors and 1 window to be permanent openings. | $84,000 |
| Apr 20, 2007 | Completed final sign-off Aug 2007 | 2346 29th Av | legalize/remove substandard construction and replace with new construction. existing light well in fill on two floor on south p/l. remodel (e) bathroom, replace all fixtures and tile. replace one (e) window in bath per complaint dated 4-19-07. clarification of pa# 200612049049Details
legalize/remove substandard construction and replace with new construction. existing light well in fill on two floor on south p/l. remodel (e) bathroom, replace all fixtures and tile. replace one (e) window in bath per complaint dated 4-19-07. clarification of pa# 200612049049 | $10,000 |
| Feb 1, 2007 | Completed final sign-off Feb 2007 | 5160 Diamond Heights Bl | replace 1 kchn cbnt, counters, appli8ances, plmg, fixtures, replace 1 bath cbnts, counter, fuacet. replace kchn and bath receptacles with g f i's . replace toilet, carpets and vinyl(kchn and bath flooringDetails
replace 1 kchn cbnt, counters, appli8ances, plmg, fixtures, replace 1 bath cbnts, counter, fuacet. replace kchn and bath receptacles with g f i's . replace toilet, carpets and vinyl(kchn and bath flooring | $15,000 |
| Dec 4, 2006 | Expired or cancelled expired Feb 2009 | 942 Stanyan St | remodel existing kitchen, bathroom, & toilet room. update and repair all plumbing & electrical. remove & repair dryrot damage as necessary. repair/replace interior doors. install new pocket door tracks x3.. repair/replace wood windows w/new wood windows as necessary. install new elect. panel. no strDetails
remodel existing kitchen, bathroom, & toilet room. update and repair all plumbing & electrical. remove & repair dryrot damage as necessary. repair/replace interior doors. install new pocket door tracks x3.. repair/replace wood windows w/new wood windows as necessary. install new elect. panel. no str | $78,000 |
| Dec 4, 2006 | Completed final sign-off Aug 2007 | 2346 29th Av | kitchen remodel with hew 1 hr. fire wall, replacement of old floor joists. addition of half bath. adding 2 skylightsDetails
kitchen remodel with hew 1 hr. fire wall, replacement of old floor joists. addition of half bath. adding 2 skylights | $40,000 |
| Nov 20, 2006 | Completed final sign-off Feb 2007 | 710 Bay St | replace (e) aluminum window in bathroom, lightwell with one hour glass block in kind opening & same size.Details
replace (e) aluminum window in bathroom, lightwell with one hour glass block in kind opening & same size. | $850 |
| Nov 10, 2006 | Completed final sign-off Feb 2007 | 710 Bay St | remodel bathroom. replace all plumbing lines and fixtures (bath, toilet, lavatory) and hook to (e) main waste in lightwell. replace all electrical. new drywall, tile, floor lover, etc. repair dry rot as necessary in bathroom. lighting to be fluorescent or on occupant sersors.Details
remodel bathroom. replace all plumbing lines and fixtures (bath, toilet, lavatory) and hook to (e) main waste in lightwell. replace all electrical. new drywall, tile, floor lover, etc. repair dry rot as necessary in bathroom. lighting to be fluorescent or on occupant sersors. | $20,000 |
| Sep 6, 2006 | Never finaled issued Sep 2006, no final | 1687 29th Av | rev. to fixture layout in master bath and groundfloor bath, lighting schedule and rcp update, rev. to (e) concrete post footingsDetails
rev. to fixture layout in master bath and groundfloor bath, lighting schedule and rcp update, rev. to (e) concrete post footings | $1,000 |
| Jul 11, 2006 | Completed final sign-off Jan 2007 | 2531 16th Av | remodel kitchen & bathroom-remove/replace cabinets, countertop, walls, floors & coverings. update plumbing & electrical as needed. remove & repair dry rot as needed.Details
remodel kitchen & bathroom-remove/replace cabinets, countertop, walls, floors & coverings. update plumbing & electrical as needed. remove & repair dry rot as needed. | $28,000 |