Permit GraphShortlistSan Francisco building permits since 2000

Broadway Mech.Cntrs.,Inc.

Contractor license
584263
State license record
Based in
Oakland
On San Francisco permits
Feb 2004 to May 2023
Last 24 months
0 permits filed

8 permits since 2000: 2 completed, 4 never finaled, 2 expired or cancelled.

Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllDeck 1Stairs 1Kitchen remodel 1

1 deck permit: 1 completed. Typically 9 days from filing to permit and 459 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
May 31, 2023Completed
final sign-off Sep 2024
333 Jefferson Stinstall two soil vapor extraction points within (e) building foundation to be connneted to a catalytic oxicize system at the roof where treatment of vdc's nd tph will occure, install associated conveyance piping withing building walls and ceilings on first fl. and through the decks of above ground
Details
Permit
202305318867
Status
complete
Filed
May 31, 2023
Permit issued
Jun 9, 2023
Final sign-off
Sep 10, 2024
Declared cost
$150,000
Address
333 Jefferson St

install two soil vapor extraction points within (e) building foundation to be connneted to a catalytic oxicize system at the roof where treatment of vdc's nd tph will occure, install associated conveyance piping withing building walls and ceilings on first fl. and through the decks of above ground

Open the permit page

$150,000