Back to bathroom remodel contractors
Bridges Construction Services Inc
- Based in
- San Lorenzo
- On San Francisco permits
- Mar 2006 to Sep 2018
- Last 24 months
- 0 permits filed
11 permits since 2000: 8 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2018 | Completed final sign-off Apr 2019 | 338 Spear St | change bathtub and replace with walkin shower in master bath. ref 2301807174789Details
change bathtub and replace with walkin shower in master bath. ref 2301807174789 | |
| Jul 17, 2018 | Completed final sign-off Apr 2019 | 338 Spear St | unit 19 a. kitchen - update (e) cabinet and countertop; no relocation of electr or walls. guest and master bathroom - replace vanity, replace tile replace shower tilesDetails
unit 19 a. kitchen - update (e) cabinet and countertop; no relocation of electr or walls. guest and master bathroom - replace vanity, replace tile replace shower tiles | $78,000 |
| May 7, 2018 | Completed final sign-off Sep 2018 | 2152 Market St | cosmetic update to guest bath. replace toilet, tiles wall floor. replace tub knew tub. replace sink and vanity. all in same location no now location for any itemDetails
cosmetic update to guest bath. replace toilet, tiles wall floor. replace tub knew tub. replace sink and vanity. all in same location no now location for any item | $25,000 |
| Apr 24, 2018 | Completed final sign-off Sep 2018 | 2152 Market St | cosmetic bathroom updgrade. change single sink to bouble vanity sink. replace (e) floor tiles with new, remove tub and create a walk-in shower. everything in same location, no moving of doors or walls.Details
cosmetic bathroom updgrade. change single sink to bouble vanity sink. replace (e) floor tiles with new, remove tub and create a walk-in shower. everything in same location, no moving of doors or walls. | $36,000 |
| Aug 28, 2007 | Never finaled issued Aug 2007, no final | 1435 Douglass St | 1 bathroom, deck repair less than 50%. lights per title 24. home remodel including tile installation, painting, new plumbing, fixture install. molding & trim install lighting fixture. replace deck flooring board.Details
1 bathroom, deck repair less than 50%. lights per title 24. home remodel including tile installation, painting, new plumbing, fixture install. molding & trim install lighting fixture. replace deck flooring board. | $2,500 |