Back to bathroom remodel contractors
Brickhouse Construction Inc
- Based in
- Brentwood
- On San Francisco permits
- Nov 2013 to Mar 2019
- Last 24 months
- 0 permits filed
15 permits since 2000: 11 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 212 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 19, 2017 | Completed final sign-off Jan 2018 | 2211 California St | unit 307: remove e non bearing wall to expand kitchen. replace cabinets and countertop new sink replace bath vanity, sink, tub, tile new sub panel, 12 can lights, upgrade kitchen, dining rm, new faucets, sub and shower valve, bath tub, tileDetails
unit 307: remove e non bearing wall to expand kitchen. replace cabinets and countertop new sink replace bath vanity, sink, tub, tile new sub panel, 12 can lights, upgrade kitchen, dining rm, new faucets, sub and shower valve, bath tub, tile | $35,000 |
| Jun 16, 2017 | Completed final sign-off Apr 2018 | 1246 34th Av | both units: kitchen & bath remodel, replacement of: 2 windows, doors. lighting upgrades. at grnd lvl- fire seperatipon of garage, new gas meter & elec utility closets. ele panel upgrades.Details
both units: kitchen & bath remodel, replacement of: 2 windows, doors. lighting upgrades. at grnd lvl- fire seperatipon of garage, new gas meter & elec utility closets. ele panel upgrades. | $166,397 |
| Oct 14, 2015 | Completed final sign-off Feb 2016 | 65 Western Shore Ln | unit #3: kitchen remodel, 2 bathroom remodels, elect upgrade.Details
unit #3: kitchen remodel, 2 bathroom remodels, elect upgrade. | $22,000 |