Back to bathroom remodel contractors
Brian Fitzmaurice
- Based in
- San Mateo
- On San Francisco permits
- Feb 2002 to Nov 2023
- Last 24 months
- 0 permits filed
56 permits since 2000: 53 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 9, 2018 | Completed final sign-off Oct 2018 | 2770 19th Av | remodel (e) master bathroom, remove tub, shower valve, surround, replace with new shower pan, valve & corian surround, 40 sq. ft.Details
remodel (e) master bathroom, remove tub, shower valve, surround, replace with new shower pan, valve & corian surround, 40 sq. ft. | $12,000 |
| Apr 6, 2018 | Completed final sign-off Jul 2018 | 70 Denslowe Dr | hall bathroom - remodel/replace fixtures/finishes to wall & ceiling framing, change tub to shower, move toilet location, change (e) swinging door to pocket door; add recessed leds, exhaust fan, gfci outlets & floor warmer. no changes on wall.Details
hall bathroom - remodel/replace fixtures/finishes to wall & ceiling framing, change tub to shower, move toilet location, change (e) swinging door to pocket door; add recessed leds, exhaust fan, gfci outlets & floor warmer. no changes on wall. | $30,000 |
| Apr 28, 2014 | Completed final sign-off Dec 2014 | 410 Crestlake Dr | romove dryrot roof framing at existing sunroom and rebuild to match (e) in kind, replace 3 rear windows in kind, remodel (e) bathroom per plan, relocate (e) window in bathroom and install lighting, switches, and receptacles.Details
romove dryrot roof framing at existing sunroom and rebuild to match (e) in kind, replace 3 rear windows in kind, remodel (e) bathroom per plan, relocate (e) window in bathroom and install lighting, switches, and receptacles. | $20,000 |
| Aug 22, 2013 | Completed final sign-off Nov 2013 | 1972 10th Av | remove & replace the (e) plumbing fixtures (tub, sink & toilet), tub surround & floor tile & dry wall in master bathroom.Details
remove & replace the (e) plumbing fixtures (tub, sink & toilet), tub surround & floor tile & dry wall in master bathroom. | $18,000 |
| Jun 25, 2012 | Completed final sign-off Aug 2012 | 410 Crestlake Dr | remodel existing bathroom - remove and replace plumbing fixture, wall, floor, tile, ceiling, wall plaster. install a new 2'x3' fix skylight in the bathroomDetails
remodel existing bathroom - remove and replace plumbing fixture, wall, floor, tile, ceiling, wall plaster. install a new 2'x3' fix skylight in the bathroom | $17,000 |
| Sep 16, 2010 | Completed final sign-off Dec 2010 | 57 Hillcrest Ct | remove & replace plumbing fixtures (shower, tub, sinks, faucets, toilets, wall & floor tiles, and light fixtures in the master & hallway bathrooms. no wall relocation.Details
remove & replace plumbing fixtures (shower, tub, sinks, faucets, toilets, wall & floor tiles, and light fixtures in the master & hallway bathrooms. no wall relocation. | $17,000 |
| Nov 5, 2009 | Completed final sign-off Apr 2010 | 2770 19th Av | kitchen-remove/repl cabinets, counter tops, appliances & flooring. add recessed lighting under cabinets, plugs &wall switches. bathrm-remove/repl bath tubs, sinks, toilets & tub/shower surrounds with solid surface materials. add recessed lights, exahust fans, switches & finish floorsDetails
kitchen-remove/repl cabinets, counter tops, appliances & flooring. add recessed lighting under cabinets, plugs &wall switches. bathrm-remove/repl bath tubs, sinks, toilets & tub/shower surrounds with solid surface materials. add recessed lights, exahust fans, switches & finish floors | $32,000 |
| Feb 5, 2007 | Completed final sign-off May 2007 | 886 Burnett Av | bathroom remove & replace the (e) bathroom sink, tub, toilet, wall & ceiling plaster, ceramic wall & floor tile, light fixtures & switches. replace the (e) bathroom window with a new glass block unit.Details
bathroom remove & replace the (e) bathroom sink, tub, toilet, wall & ceiling plaster, ceramic wall & floor tile, light fixtures & switches. replace the (e) bathroom window with a new glass block unit. | $12,000 |
| Dec 21, 2006 | Completed final sign-off Mar 2007 | 57 States St | remove + replace the existing tub, shower pan, sinks, faucets, toilets, exhaust fans, light fixtures, and floor+wall tile in the 2 (e) bathrooms. with in 57 states unit.remove + replace (e) 24" north bathroom window with a new 16" window. provide flourescent light or o.s. in bathroom.Details
remove + replace the existing tub, shower pan, sinks, faucets, toilets, exhaust fans, light fixtures, and floor+wall tile in the 2 (e) bathrooms. with in 57 states unit.remove + replace (e) 24" north bathroom window with a new 16" window. provide flourescent light or o.s. in bathroom. | $30,000 |
| Jun 5, 2006 | Completed final sign-off Aug 2006 | 313 Los Palmos Dr | remove & replace the exdisting plumbing fixtures (shower pan, toilet, sink, faucet, tub & shower valves) wall & floor tile and light fixtures in the guest bathroom. no structural changes.Details
remove & replace the exdisting plumbing fixtures (shower pan, toilet, sink, faucet, tub & shower valves) wall & floor tile and light fixtures in the guest bathroom. no structural changes. | $14,000 |
| Mar 21, 2005 | Completed final sign-off Dec 2005 | 311 San Jose Av | proposed interior remodel to include 1 kitchen & 1 bathroom, & to convert (e) hallway & mechanicalDetails
proposed interior remodel to include 1 kitchen & 1 bathroom, & to convert (e) hallway & mechanical | $75,000 |
| Feb 7, 2002 | Completed final sign-off Mar 2002 | 2341 Francisco St | remodel existing bathroom & water closet on the 1st floor.Details
remodel existing bathroom & water closet on the 1st floor. | $4,000 |