Brian Domingo Dba Energy Savings Authori
- Based in
- Roseville
- On San Francisco permits
- Sep 2025 to Sep 2025
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2025 | Expired or cancelled withdrawn Aug 2026 | 479 Collingwood St | solar permit: installing 23 solar pv modules, 545 watts per module, total no. of rating 12.535 kw. mounted: roof, ballasted: y, including 2 energy storage unit, of 240 vac, with 13.44 kwh each in capacity, ess units will not be closer than 3 feet | 12.54kw roofmount pDetails
solar permit: installing 23 solar pv modules, 545 watts per module, total no. of rating 12.535 kw. mounted: roof, ballasted: y, including 2 energy storage unit, of 240 vac, with 13.44 kwh each in capacity, ess units will not be closer than 3 feet | 12.54kw roofmount p |