Brendan J Uniacke Construction
- Based in
- San Bruno
- On San Francisco permits
- Apr 2023 to Jan 2026
- Last 24 months
- 3 permits filed
8 permits since 2000: 3 completed, 3 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 in progress. Typically 207 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2026 | In progress issued Aug 2026 | 407 Teresita Bl | full remodel (e) 3 story bldg. (n) cantilever decks w/ sliding doors. infill (e) lightwell and replace front window & exterior wall finishes. remodel 1st flr space to (n) family w/ bathroom & wetbar. 2nd: create master suite and laundry. 3rd: remodel kitchen bathroom, lightwell infill. and skylightsDetails
full remodel (e) 3 story bldg. (n) cantilever decks w/ sliding doors. infill (e) lightwell and replace front window & exterior wall finishes. remodel 1st flr space to (n) family w/ bathroom & wetbar. 2nd: create master suite and laundry. 3rd: remodel kitchen bathroom, lightwell infill. and skylights | $450,000 |