Braswell Construction
- Based in
- Livermore
- On San Francisco permits
- May 2001 to Sep 2014
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2014 | Completed final sign-off Feb 2015 | 1900 14th Av | restucco 4' x 30' wall. remove stucco and add wire and 20 pound felt. new paper, new wire, new stucco. work is the rear of the building.Details
restucco 4' x 30' wall. remove stucco and add wire and 20 pound felt. new paper, new wire, new stucco. work is the rear of the building. | $800 |
| Sep 16, 2014 | Completed final sign-off Feb 2015 | 1900 14th Av | reroofingDetails
reroofing | $8,000 |
| Sep 16, 2014 | Expired or cancelled cancelled Oct 2014 | 1900 14th Av | remove plywood fron the roof and install new ply wood on roof 5/8" plywood nailing 10" on center size 10 nailDetails
remove plywood fron the roof and install new ply wood on roof 5/8" plywood nailing 10" on center size 10 nail | $800 |
| May 4, 2001 | Completed final sign-off May 2001 | 350 Florida St | demo top four feet of wall & remove window type air conditioner & drainage pipe, repair hold throughDetails
demo top four feet of wall & remove window type air conditioner & drainage pipe, repair hold through | $3,000 |