Back to bathroom remodel contractors
Brady Construction Inc
- Based in
- San Bruno
- On San Francisco permits
- Oct 2006 to Sep 2026
- Last 24 months
- 8 permits filed
118 permits since 2000: 93 completed, 4 in progress, 16 never finaled, 5 expired or cancelled.
Of the 16 never-finaled permits, 5 are 3 to 5 years old, 3 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 27 completed, 3 never finaled, 1 expired or cancelled. Typically 15 days from filing to permit and 285 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 9, 2023 | Completed final sign-off Jul 2024 | 1147 Lake St | interior remodel; kitchen and bathroom renovation; replacement of non-front facade exterior windowsDetails
interior remodel; kitchen and bathroom renovation; replacement of non-front facade exterior windows | $95,000 |
| May 25, 2023 | Never finaled issued Jun 2023, no final | 2778 Green St | revision to 201309257720 addenda 2. basememt remodel including above ground endless lap pool. above ground hot tub, and partial excavation for elevator & bathroomDetails
revision to 201309257720 addenda 2. basememt remodel including above ground endless lap pool. above ground hot tub, and partial excavation for elevator & bathroom | |
| May 9, 2023 | Completed final sign-off Nov 2023 | 88 Entrada Ct | non structural remodel of two bathrooms in kindDetails
non structural remodel of two bathrooms in kind | $15,000 |
| Jun 2, 2022 | Completed final sign-off Apr 2023 | 60 Cedro Av | remodel of existing single family kitchen & upstairs bathroom and structural upgrade to existing foundation.Details
remodel of existing single family kitchen & upstairs bathroom and structural upgrade to existing foundation. | $125,000 |
| Feb 25, 2022 | Completed final sign-off Aug 2022 | 250 Santa Paula Av | master bath remodel new tile and fixtures. no change to floor plan or structureDetails
master bath remodel new tile and fixtures. no change to floor plan or structure | $20,000 |
| Jul 29, 2021 | Completed final sign-off Jul 2023 | 1470 Portola Dr | existing basement remodel within (e) envelope, adding (2) bathrooms, & bedroom, interior remodel to kitchen and bathrooms replace exterior wood deck and stairs, eplace in kind all windows, except bathroom window leaded glass windows to remain- insulated inserts on interiorDetails
existing basement remodel within (e) envelope, adding (2) bathrooms, & bedroom, interior remodel to kitchen and bathrooms replace exterior wood deck and stairs, eplace in kind all windows, except bathroom window leaded glass windows to remain- insulated inserts on interior | $200,000 |
| Jun 10, 2021 | Completed final sign-off Jul 2021 | 1273 Arguello Bl | remodel (1) bathroom & powder room tile, replace countertop inkitchen, no change to cabinets/sinkDetails
remodel (1) bathroom & powder room tile, replace countertop inkitchen, no change to cabinets/sink | $10,000 |
| May 24, 2021 | Completed final sign-off Apr 2022 | 65 San Lorenzo Wy | window replacement and interior kitchen, bathroom, and basement remodel. add new half bathDetails
window replacement and interior kitchen, bathroom, and basement remodel. add new half bath | $50,000 |
| Jun 7, 2019 | Never finaled issued Dec 2020, no final | 274 Duncan St | revised site permit #201508275398. 3rd & 4th flrs vertical & horizontal addition. lower unit: rebuilt kitchen, and relocated & rebuild (1) bath, and interior remodel. upper unit: rebuilt kitchen, (1) relocate & rebuilt bath, (2) (n) full bath, (1) (n) 1/2 bath, and interior remodel.Details
revised site permit #201508275398. 3rd & 4th flrs vertical & horizontal addition. lower unit: rebuilt kitchen, and relocated & rebuild (1) bath, and interior remodel. upper unit: rebuilt kitchen, (1) relocate & rebuilt bath, (2) (n) full bath, (1) (n) 1/2 bath, and interior remodel. | |
| Apr 10, 2019 | Completed final sign-off Sep 2019 | 2557 Filbert St | remodel of (e) single family home. 1st fl: (n) laundry, (2)(n) bedrooms with ensuite bathrooms, relocate w/h & furnace. 2nd fl: (n) stairs, rmeodel kitchen & relocate laundry. 3rd fl: (2) (n) ensuite bathrooms for (e) bathrooms, expand dormer, (n) dormer over bathroom 3.Details
remodel of (e) single family home. 1st fl: (n) laundry, (2)(n) bedrooms with ensuite bathrooms, relocate w/h & furnace. 2nd fl: (n) stairs, rmeodel kitchen & relocate laundry. 3rd fl: (2) (n) ensuite bathrooms for (e) bathrooms, expand dormer, (n) dormer over bathroom 3. | $250,000 |
| Apr 10, 2019 | Completed final sign-off Jan 2020 | 2567 Filbert St | remodel of (e) single family home. 1st fl: relocate w/d to 3rd fl. (n) family rm. 2nd fl: add powder room to kitchen. 3rd fl: reconfig master bed & bath, reconfigure half to full bath.Details
remodel of (e) single family home. 1st fl: relocate w/d to 3rd fl. (n) family rm. 2nd fl: add powder room to kitchen. 3rd fl: reconfig master bed & bath, reconfigure half to full bath. | $300,000 |
| Feb 11, 2019 | Completed final sign-off Jan 2020 | 34 Entrada Ct | remodel kitchen and (e) bath, add laundry and (n) bath. minor infill at rear facade. new deck at rearDetails
remodel kitchen and (e) bath, add laundry and (n) bath. minor infill at rear facade. new deck at rear | $50,000 |
| Sep 4, 2018 | Completed final sign-off Feb 2020 | 34 Entrada Ct | foundation replacement and remodel one extg bathroomDetails
foundation replacement and remodel one extg bathroom | $30,000 |
| Mar 9, 2018 | Completed final sign-off Jan 2020 | 2502 Broadway | lightwell infill at 3rd fl not shared lightwell. revision of master bath previously approved under permit #201704254805, replace windows, balusters & decorative columns at facade. maher not reqDetails
lightwell infill at 3rd fl not shared lightwell. revision of master bath previously approved under permit #201704254805, replace windows, balusters & decorative columns at facade. maher not req | $30,000 |
| Mar 2, 2018 | Completed final sign-off Jul 2018 | 4234 22nd St | this project involve the conversion of e non habitable space at level 1 to become a new 450 sf 2nd dwelling unit. includes new living room/kitchen, full bath, bedroom. all work within the existing footprintDetails
this project involve the conversion of e non habitable space at level 1 to become a new 450 sf 2nd dwelling unit. includes new living room/kitchen, full bath, bedroom. all work within the existing footprint | $50,000 |
| Nov 7, 2017 | Completed final sign-off Dec 2018 | 779 Duncan St | revision to pa 2017-0518-6939 reduced structural & architectural scope - remove 1st floor bathroom and other conditioned space from original scopeDetails
revision to pa 2017-0518-6939 reduced structural & architectural scope - remove 1st floor bathroom and other conditioned space from original scope | |
| May 18, 2017 | Completed final sign-off Dec 2018 | 779 Duncan St | remodel (e) kitchen, 1 bathroom, add 1 powder room & skylight @ 2nd floor. enlarge/excavate entry, bath & storage area to achieve 8'-0" ceiling height, add one bathroom, wine room, add new sliding glass doors & windows, remodel laundry/storage area @ 1st floor.Details
remodel (e) kitchen, 1 bathroom, add 1 powder room & skylight @ 2nd floor. enlarge/excavate entry, bath & storage area to achieve 8'-0" ceiling height, add one bathroom, wine room, add new sliding glass doors & windows, remodel laundry/storage area @ 1st floor. | $150,000 |
| Apr 25, 2017 | Completed final sign-off Jan 2020 | 2502 Broadway | convert extg basement to habitable space. new double height room at basement and ground floor within extg bldg envelope. replace of extg exterior doors at rear facade only. remodel extg kitchen and master bath.Details
convert extg basement to habitable space. new double height room at basement and ground floor within extg bldg envelope. replace of extg exterior doors at rear facade only. remodel extg kitchen and master bath. | $225,000 |
| Feb 27, 2017 | Completed final sign-off Jan 2020 | 2502 Broadway | remodel kitchen and master bathroom. no structural plans. all walls to remain in some location.Details
remodel kitchen and master bathroom. no structural plans. all walls to remain in some location. | $60,000 |
| Jan 10, 2017 | Completed final sign-off Jul 2017 | 2930 Lake St | remodel (2) existing bathrooms. no structural changesDetails
remodel (2) existing bathrooms. no structural changes | $20,000 |
| Jul 14, 2016 | Completed final sign-off Jul 2018 | 4234 22nd St | horizontal & vertical rear yard addition & interior remodel adding non-habitable on level 1 & habitable on level 2 & 3 including 1 1/2 bath, 1 bedrm & deck & (n) entry steps.Details
horizontal & vertical rear yard addition & interior remodel adding non-habitable on level 1 & habitable on level 2 & 3 including 1 1/2 bath, 1 bedrm & deck & (n) entry steps. | $200,000 |
| Mar 30, 2016 | Never finaled issued Mar 2016, no final | 2918 Sacramento St | remodel of master bathroom, master bedroom and guest bath. install new door to rear deck, replace windows in bedroom. windows not visible from street.Details
remodel of master bathroom, master bedroom and guest bath. install new door to rear deck, replace windows in bedroom. windows not visible from street. | $65,000 |
| Mar 9, 2016 | Completed final sign-off Oct 2017 | 858 Ashbury St | excavate (e)basement to maintain 9'0"(n)slab,foundation,(n)bath(n)media room,(n)bed,kitchenette,lighting throughout.on level 2 reno kitchen,bath,bed,(n)window in lr,(n)entry to unit 1,in common area new laundry,utility,hw heaters,new landscaping,repair fire escape.Details
excavate (e)basement to maintain 9'0"(n)slab,foundation,(n)bath(n)media room,(n)bed,kitchenette,lighting throughout.on level 2 reno kitchen,bath,bed,(n)window in lr,(n)entry to unit 1,in common area new laundry,utility,hw heaters,new landscaping,repair fire escape. | $275,000 |
| Dec 22, 2015 | Completed final sign-off Feb 2018 | 7 Bennington St | 1st flr. remodel storage area behind garage to add bedroom, bath & media room. 2nd flr- remove non bearing wall between living & dining rms, build (n) enclosed stairway to 1st flr, remove deck & stairs @ rear yard.Details
1st flr. remodel storage area behind garage to add bedroom, bath & media room. 2nd flr- remove non bearing wall between living & dining rms, build (n) enclosed stairway to 1st flr, remove deck & stairs @ rear yard. | $85,000 |
| Aug 7, 2015 | Completed final sign-off Dec 2016 | 1177 Guerrero St | horizontal/vertical addition. 165 sq. ft horizontal/vertical addition with a 55 sq. ft. footprint at southern side of structure. remodel upper level bathrooms and bedrooms. (n) radiant heat at upper level floorDetails
horizontal/vertical addition. 165 sq. ft horizontal/vertical addition with a 55 sq. ft. footprint at southern side of structure. remodel upper level bathrooms and bedrooms. (n) radiant heat at upper level floor | $15,000 |
| Oct 30, 2013 | Completed final sign-off Feb 2014 | 2502 Broadway | legalize and remodel existing 1st floor bathroom, bedroom and closet.Details
legalize and remodel existing 1st floor bathroom, bedroom and closet. | $20,000 |
| Jul 30, 2013 | Completed final sign-off Sep 2013 | 154 Park St | replace foundation in utility room & add shear wall in garage, move toilet form utility room to water closet/bathroom, add new furnace in garage, add two new closets on ground floor.Details
replace foundation in utility room & add shear wall in garage, move toilet form utility room to water closet/bathroom, add new furnace in garage, add two new closets on ground floor. | $12,000 |
| May 10, 2013 | Completed final sign-off Oct 2013 | 35 Prosper St | ground gloor apartment remodel. kitchen, bath, remodel. new bath. new foundation per plan. structural strengthening per plan. relocate rooms.Details
ground gloor apartment remodel. kitchen, bath, remodel. new bath. new foundation per plan. structural strengthening per plan. relocate rooms. | $90,000 |
| Mar 29, 2013 | Completed final sign-off Mar 2015 | 131 Devonshire Wy | horizontal addition, 3 renovated bathroom (full), 1 renovated kitchen, 1 fire place retrofit.Details
horizontal addition, 3 renovated bathroom (full), 1 renovated kitchen, 1 fire place retrofit. | $400,000 |
| Nov 14, 2012 | Expired or cancelled expired Dec 2018 | 770 Natoma St | work in unit #4: replace (e) interior doors, update kitchen and bathroom, replace 6 windows in kind, not visible from street. some sheetrock and insulation, basic trimwork.Details
work in unit #4: replace (e) interior doors, update kitchen and bathroom, replace 6 windows in kind, not visible from street. some sheetrock and insulation, basic trimwork. | $25,000 |
| Sep 21, 2011 | Completed final sign-off Dec 2011 | 770 Natoma St | remodel of unit #2 + unit # 5. scope demo sheetrock in units down to studs. upgrade electrical. install new insulation + sheet rock. install remodel windows and upgrade kitchen in the two units. no change on walls and openings, no bathroom work.Details
remodel of unit #2 + unit # 5. scope demo sheetrock in units down to studs. upgrade electrical. install new insulation + sheet rock. install remodel windows and upgrade kitchen in the two units. no change on walls and openings, no bathroom work. | $50,000 |