Bradley Construction Enterprises
- Based in
- Woodside
- On San Francisco permits
- Aug 2013 to Apr 2019
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2019 | Completed final sign-off Jun 2023 | 844 Potrero Av | expand bldg towards the side property line at rear. (n) deck at rear. raise roof at rear to match (e) roof. (n) rooms & bathroom on ground flr.Details
expand bldg towards the side property line at rear. (n) deck at rear. raise roof at rear to match (e) roof. (n) rooms & bathroom on ground flr. | $85,000 |
| May 20, 2015 | Completed final sign-off Jun 2015 | 428 43rd Av | to comply with nov #201520991 corrections. remove non-conform extg stairway (not visible from street) item #3. install handrails int stairway item #2. remove and reinstall water heater. repair drywall.Details
to comply with nov #201520991 corrections. remove non-conform extg stairway (not visible from street) item #3. install handrails int stairway item #2. remove and reinstall water heater. repair drywall. | $5,000 |
| Aug 6, 2013 | Completed final sign-off Jan 2014 | 208 Galewood Cr | replace damaged dryrot wood framing at rear balcony. patch stucco as necessary.Details
replace damaged dryrot wood framing at rear balcony. patch stucco as necessary. | $30,000 |