Boman Deign & Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2018 to Jan 2026
- Last 24 months
- 4 permits filed
12 permits since 2000: 6 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 in progress. Typically 32 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2026 | In progress issued Feb 2026 | 733 Holloway Av | 1) repair deck less than 50% repair, at back bldg. common deck. comply w/ nov #201712501, item 2. 2)repair roof. 3)remove egress obstructions at side secondary stairway staurwat(810 hc) 4)remove mold/mildew on the ceiling, wall, & doors). replace missing stove/hood vent.change windows&doors in kind.Details
1) repair deck less than 50% repair, at back bldg. common deck. comply w/ nov #201712501, item 2. 2)repair roof. 3)remove egress obstructions at side secondary stairway staurwat(810 hc) 4)remove mold/mildew on the ceiling, wall, & doors). replace missing stove/hood vent.change windows&doors in kind. | $9,500 |