Back to bathroom remodel contractors
Boko Build
- Based in
- San Francisco
- On San Francisco permits
- Apr 2024 to Sep 2025
- Last 24 months
- 2 permits filed
4 permits since 2000: 2 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 2 in progress. Typically 1 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2025 | In progress issued Sep 2025 | 1387 33rd Av | kitchen remodel: new countertops, bring plumbing to code, new fixtures and update appliances. bathroom remodel: remove and replace tile w/new. new tub, new toilet and update fixtures. new shower pan, bring plumbing and electrical up to code. vent fan.Details
kitchen remodel: new countertops, bring plumbing to code, new fixtures and update appliances. bathroom remodel: remove and replace tile w/new. new tub, new toilet and update fixtures. new shower pan, bring plumbing and electrical up to code. vent fan. | $24,000 |
| Sep 11, 2025 | In progress issued Sep 2025 | 1389 33rd Av | kitchen remodel: remove and replace cabinets, countertops and flooring. update fixtures, appliances. bring plumbing and electrical up to code. bathroom remodel: remove and replace tile w/new. new tub, new toilet and update fixtures. new shower pan. bring plumbing and electrical to code. vent fan.Details
kitchen remodel: remove and replace cabinets, countertops and flooring. update fixtures, appliances. bring plumbing and electrical up to code. bathroom remodel: remove and replace tile w/new. new tub, new toilet and update fixtures. new shower pan. bring plumbing and electrical to code. vent fan. | $30,000 |
| Apr 2, 2024 | Completed final sign-off Sep 2024 | 675 27th St | bathroom rennovation- toilet & plumbing to be moved. add gfci, new switches, new wall & floor tile. install new vanity and recessed lighting in the ceiling. new exhaust fan.Details
bathroom rennovation- toilet & plumbing to be moved. add gfci, new switches, new wall & floor tile. install new vanity and recessed lighting in the ceiling. new exhaust fan. | $35,000 |