Back to bathroom remodel contractors
Boivin Environmental
- Based in
- San Francisco
- On San Francisco permits
- Aug 2012 to May 2026
- Last 24 months
- 5 permits filed
47 permits since 2000: 18 completed, 2 in progress, 20 never finaled, 7 expired or cancelled.
Of the 20 never-finaled permits, 1 is 3 to 5 years old, 9 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
12 bathroom remodel permits: 4 completed, 6 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2026 | Completed final sign-off May 2026 | 1222 12th Av | bathroom and laundry room remodeling, like for like.Details
bathroom and laundry room remodeling, like for like. | $10,000 |
| Nov 9, 2023 | Expired or cancelled withdrawn Dec 2023 | 3406 Market St | two kitchen and two bathroom remodel: no change in floor plan: replace countertopd, appliances, vanity, cabinets in kind.Details
two kitchen and two bathroom remodel: no change in floor plan: replace countertopd, appliances, vanity, cabinets in kind. | $25,000 |
| Jan 10, 2023 | Never finaled issued Feb 2023, no final | 3404 Market St | 1 bathroom remodelDetails
1 bathroom remodel | $25,000 |
| Jan 3, 2023 | Expired or cancelled cancelled Jan 2026 | 3400 Market St | bathroom remodel; new standing shower; new toilet and vanity; install new gfci outletDetails
bathroom remodel; new standing shower; new toilet and vanity; install new gfci outlet | $5,000 |
| Jan 12, 2022 | Completed final sign-off Oct 2022 | 91 06th St | comply w/ nov #201845941 pid in #91 only. reconfigure floor plan, upgrade ada bathroom. (n) accessible counter, (n) hand sink, (n) quarry tile floor w/ quarry tile cove @ work area & kitchen (only work in restaurant)Details
comply w/ nov #201845941 pid in #91 only. reconfigure floor plan, upgrade ada bathroom. (n) accessible counter, (n) hand sink, (n) quarry tile floor w/ quarry tile cove @ work area & kitchen (only work in restaurant) | $10,000 |
| Oct 3, 2020 | Never finaled issued Oct 2020, no final | 1220 12th Av | bathroom remodeling - replace tile and fixture. no change in layoutDetails
bathroom remodeling - replace tile and fixture. no change in layout | $5,000 |
| Feb 14, 2020 | Completed final sign-off Jul 2020 | 2201 Sacramento St | apt 501: remodel bathroom: replaceshower tile & faucet only. bedroom remodeling: replace celing sheetrock with 5/8in type x. install new recessed lgihts for 2 bedrooms.Details
apt 501: remodel bathroom: replaceshower tile & faucet only. bedroom remodeling: replace celing sheetrock with 5/8in type x. install new recessed lgihts for 2 bedrooms. | $4,800 |
| Jun 3, 2019 | Completed final sign-off Nov 2019 | 3372 19th St | tile repair remove all garbage, on restroom and main fl, dining room, bathroom. waterproof membrane. no room layout change, no structural work.Details
tile repair remove all garbage, on restroom and main fl, dining room, bathroom. waterproof membrane. no room layout change, no structural work. | $3,500 |
| May 24, 2018 | Never finaled issued May 2018, no final | 375 Potrero Av | to comply with notice of violation #201863761 - electrical wiring installed for furnace and front entry lighting without the benefit of a permit. install 2" copper pipe for bathroom sink. all work at residential unit d.Details
to comply with notice of violation #201863761 - electrical wiring installed for furnace and front entry lighting without the benefit of a permit. install 2" copper pipe for bathroom sink. all work at residential unit d. | $12,000 |
| Apr 13, 2018 | Never finaled issued Sep 2018, no final | 1196 Folsom St | add new ada bathroom. replace entry door with 3 feet ada door. n/a for maherDetails
add new ada bathroom. replace entry door with 3 feet ada door. n/a for maher | $10,000 |
| Dec 12, 2016 | Never finaled issued Dec 2016, no final | 1991 09th Av | install new sewer line for remodeling kitchen, laundry, bathroom and service bathroom. installnew electrical ckt for dryer. install new cold and hot water lines.Details
install new sewer line for remodeling kitchen, laundry, bathroom and service bathroom. installnew electrical ckt for dryer. install new cold and hot water lines. | $9,000 |
| Dec 17, 2013 | Never finaled issued Dec 2013, no final | 1177 California St | one bathroom remodeling, replacement lights, electrical outlets, shower tub bathroom sink toilet, replacement of 4 lights, in livingroom area.Details
one bathroom remodeling, replacement lights, electrical outlets, shower tub bathroom sink toilet, replacement of 4 lights, in livingroom area. | $15,000 |