Back to bathroom remodel contractors
Bluesky Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Jul 2014
- Last 24 months
- 0 permits filed
18 permits since 2000: 13 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 2 days from filing to permit and 103 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2009 | Completed final sign-off Dec 2009 | 254 Hale St | move (e) non-bearing wall to enlarge (e) guest bedroom, relocate (e) bathroom, add laundry room, relocate (e) furnace & water heater at ground floor.Details
move (e) non-bearing wall to enlarge (e) guest bedroom, relocate (e) bathroom, add laundry room, relocate (e) furnace & water heater at ground floor. | $23,000 |
| Aug 14, 2008 | Completed final sign-off Nov 2008 | 1681 Fulton St | repair (e) residence to comply with complaint# 200719631. replace all windows in unit in kind. no change in dimenson (u max = 0.67) repair loose tiles on front stair case. repair bathroom wtih new tub, toilet, & vanity with tiles on tub wall & floor. repair kitchen with new cabinet, sink & linoleumDetails
repair (e) residence to comply with complaint# 200719631. replace all windows in unit in kind. no change in dimenson (u max = 0.67) repair loose tiles on front stair case. repair bathroom wtih new tub, toilet, & vanity with tiles on tub wall & floor. repair kitchen with new cabinet, sink & linoleum | $13,500 |
| Apr 16, 2007 | Completed final sign-off Jun 2008 | 1289 Pacific Av | remodel extg ground floor office space to change store front. add half-bath. upgrade extg bath and change out all rear wndw, configure interior walls. structural upgrade at ground floor only.Details
remodel extg ground floor office space to change store front. add half-bath. upgrade extg bath and change out all rear wndw, configure interior walls. structural upgrade at ground floor only. | $25,000 |
| Mar 30, 2006 | Never finaled issued Mar 2006, no final | 243 Holloway Av | remodel bathroom on 2nd floor and remodel half bath and full bath in basement.Details
remodel bathroom on 2nd floor and remodel half bath and full bath in basement. | $8,000 |