Back to bathroom remodel contractors
Blue Mountain Construction Services Inc
- Based in
- Vacaville
- On San Francisco permits
- Jun 2012 to May 2022
- Last 24 months
- 0 permits filed
107 permits since 2000: 93 completed, 12 never finaled, 2 expired or cancelled.
Of the 12 never-finaled permits, 8 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2016 | Never finaled issued Jan 2017, no final | 36 Brunswick St | kitchen and bath remodel. all new range like for like. hood to existing vent. min. one light in bath to be high eff. min. 50% of kitchen to be high eff.Details
kitchen and bath remodel. all new range like for like. hood to existing vent. min. one light in bath to be high eff. min. 50% of kitchen to be high eff. | $41,000 |
| Oct 12, 2016 | Completed final sign-off May 2018 | 649 Jones St | remove cabinets & sink.cap plumbing. remove cabinet, sink & toilet at illegal bathroom. both locations in basement, cap plumbing.Details
remove cabinets & sink.cap plumbing. remove cabinet, sink & toilet at illegal bathroom. both locations in basement, cap plumbing. | $3,000 |
| Dec 9, 2013 | Completed final sign-off Sep 2014 | 1 Rosella Ct | kitchen and bath remodel. demo walls in attic to comply with code enforcement. remove kitchen in bottom floor to comply with code enforcement. legalize rooms and bath at gr fl. half bath to remain.Details
kitchen and bath remodel. demo walls in attic to comply with code enforcement. remove kitchen in bottom floor to comply with code enforcement. legalize rooms and bath at gr fl. half bath to remain. | $26,000 |
| Nov 22, 2013 | Completed final sign-off Apr 2014 | 1619 Kirkwood Av | to comply with nov # 201242701 & 20012477kitchen and bath remodel, living space convert back to storageDetails
to comply with nov # 201242701 & 20012477kitchen and bath remodel, living space convert back to storage | $26,000 |
| May 15, 2013 | Completed final sign-off Aug 2013 | 3965 Sacramento St | new bathromm on 3rd level. 2nd level:renovate extg bathroom to become new master bathroom. new closets for extg bedrooms 303 and 305 and renovate extg closets for bedroom 303 and 305 to become connected new bathroom. 1st level:renovate kitchen and new opening from dining room to nook.Details
new bathromm on 3rd level. 2nd level:renovate extg bathroom to become new master bathroom. new closets for extg bedrooms 303 and 305 and renovate extg closets for bedroom 303 and 305 to become connected new bathroom. 1st level:renovate kitchen and new opening from dining room to nook. | $100,000 |
| Jan 23, 2013 | Completed final sign-off Feb 2013 | 8200 Oceanview Tr | kitchen remodel & bath remodel, no change in wall and openings in unit 211. kitchen lighting 50% total wattage shall be high efficacy; bathroom lighting shall be high efficacy min 50% or controlld by manual - on occupancy sensor.Details
kitchen remodel & bath remodel, no change in wall and openings in unit 211. kitchen lighting 50% total wattage shall be high efficacy; bathroom lighting shall be high efficacy min 50% or controlld by manual - on occupancy sensor. | $22,000 |
| Jun 15, 2012 | Expired or cancelled expired Jan 2016 | 1131 Key Av | kitchen relocation to other side/kitchen remodel include new cabs., tops lighting, sink, electrical, plumbing, like fixtures. bath remodel to include new electrical, plumbing, vanity, toilet, tub/shower. remove non-load bearing wall @ attic. re-plumb & electrical for utilities.Details
kitchen relocation to other side/kitchen remodel include new cabs., tops lighting, sink, electrical, plumbing, like fixtures. bath remodel to include new electrical, plumbing, vanity, toilet, tub/shower. remove non-load bearing wall @ attic. re-plumb & electrical for utilities. | $18,000 |