Blue Fox Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Aug 2026
- Last 24 months
- 2 permits filed
50 permits since 2000: 43 completed, 1 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 12, 2015 | Completed final sign-off Apr 2015 | 540 Clipper St | replace kitchen cabinets & couner top, replace shower pan & tile in one bathroom, replace tile in tub enclosure and bathroom, paint thru out,no structural workDetails
replace kitchen cabinets & couner top, replace shower pan & tile in one bathroom, replace tile in tub enclosure and bathroom, paint thru out,no structural work | $40,000 |
| Jan 5, 2015 | Completed final sign-off Apr 2015 | 2761 Golden Gate Av | remove lath & plaster from two bathrooms, install new circuit for two g.f.c.i outlets, install two new ceiling fans, replace galv. angle steps to copper, insulation ceiling walls w/r19 & r13. install new 5/8 mildew resistent & fire resistant dry wall, replace two new sinks & cabinets & one toilet.Details
remove lath & plaster from two bathrooms, install new circuit for two g.f.c.i outlets, install two new ceiling fans, replace galv. angle steps to copper, insulation ceiling walls w/r19 & r13. install new 5/8 mildew resistent & fire resistant dry wall, replace two new sinks & cabinets & one toilet. | $25,000 |
| Sep 10, 2012 | Completed final sign-off Feb 2013 | 540 Clipper St | replace ceiling drywall 5/8 fir rated un unit #4, replace shower stall & pan, sub floor, sink, toilet & paint in new bathroom in unit #2. replace sub flooring, toilet, sink in unit #2 bathroomDetails
replace ceiling drywall 5/8 fir rated un unit #4, replace shower stall & pan, sub floor, sink, toilet & paint in new bathroom in unit #2. replace sub flooring, toilet, sink in unit #2 bathroom | $20,000 |
| Sep 5, 2008 | Completed final sign-off Apr 2009 | 1231 23rd Av | convert existing basement to family recreation room with closet. enlarge window. add full bath.Details
convert existing basement to family recreation room with closet. enlarge window. add full bath. | $25,000 |
| Apr 18, 2008 | Completed final sign-off Aug 2008 | 299 09th St | convert existing bathrooms to comply w/ ada requirements bathrooms will be unisex.Details
convert existing bathrooms to comply w/ ada requirements bathrooms will be unisex. | $30,000 |
| Aug 3, 2007 | Completed final sign-off Apr 2008 | 1295 Monterey Bl | kitchen/bathroom remodel- per plans. no window replacement on this applicationDetails
kitchen/bathroom remodel- per plans. no window replacement on this application | $84,000 |
| Jul 2, 2007 | Completed final sign-off Mar 2008 | 1408 Lyon St | remove kitchen & termite lines to source in basement. legalize to storage space with 1 bathroom and comply to nov date 11/06/06 #200674503.Details
remove kitchen & termite lines to source in basement. legalize to storage space with 1 bathroom and comply to nov date 11/06/06 #200674503. | $2,500 |