Blue Coast Contracting
- Based in
- San Francisco
- On San Francisco permits
- Jun 2018 to Jun 2022
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 204 days from filing to permit and 1432 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2021 | Completed final sign-off Oct 2025 | 55 Marietta Dr | replace (e) rear yard access stair with an upper walkway / deck, and 2 stair runs. will be cantilevered from rear building wall. max 10' high. replace (e) yard-level deck. max 3' height. retaining wall (2') at rear for planter. replace rear wall door & window at crawlspace utility/storage room.Details
replace (e) rear yard access stair with an upper walkway / deck, and 2 stair runs. will be cantilevered from rear building wall. max 10' high. replace (e) yard-level deck. max 3' height. retaining wall (2') at rear for planter. replace rear wall door & window at crawlspace utility/storage room. | $49,000 |