Blue & Blue Construction Co
- Based in
- San Rafael
- On San Francisco permits
- Mar 2008 to Apr 2009
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 71 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 28, 2008 | Completed final sign-off Aug 2008 | 1642 21st Av | replace toilet, remove pedestal sink, add vanity. remove shower, replace tub, add shower in tub, add sink in half bath (water closet), add toilet where shower was, add 6 gfi's, 2 dimmer switches, install florescents in 1/2 bathDetails
replace toilet, remove pedestal sink, add vanity. remove shower, replace tub, add shower in tub, add sink in half bath (water closet), add toilet where shower was, add 6 gfi's, 2 dimmer switches, install florescents in 1/2 bath | $10,000 |