Back to bathroom remodel contractors
Blu Sky Restoration Contractors Llc
- Based in
- Centennial
- On San Francisco permits
- Jul 2020 to Oct 2026
- Last 24 months
- 23 permits filed
42 permits since 2000: 25 completed, 10 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 36 days from filing to permit and 85 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2025 | Completed final sign-off Oct 2025 | 1940 Vallejo St | unit 3- interior demo and removal and remediation of asbestor containing materials in lath and plaster walls and floor tiles in kitchen, maids bathroom and bedroom, including destroyed kitchen cabinetry resulting from fire in unit 5 and water intrusion into unit 3. remodel under other permitDetails
unit 3- interior demo and removal and remediation of asbestor containing materials in lath and plaster walls and floor tiles in kitchen, maids bathroom and bedroom, including destroyed kitchen cabinetry resulting from fire in unit 5 and water intrusion into unit 3. remodel under other permit | $25,000 |
| Nov 6, 2024 | Completed final sign-off May 2025 | 115 Lake Merced Hill St South St | to comply nov 202417701- fire damage repair to party wall in kitchen and bathroom area of unit 113, staircase area for unit 115. interior finishes, roof material , as needed and electrical work like for like as needed. fire damage interior work only, no exterior workDetails
to comply nov 202417701- fire damage repair to party wall in kitchen and bathroom area of unit 113, staircase area for unit 115. interior finishes, roof material , as needed and electrical work like for like as needed. fire damage interior work only, no exterior work | $50,000 |
| Nov 23, 2022 | Never finaled issued Nov 2022, no final | 35 Casa Wy | water loss, plaster walls and ceilings= selective demolition. demo scope available for affected reference. emergency services. unit #303- bathroom. unit #203- (2) closets, unit #201- bedroom, unit #103-bathroom, hallway, closet, bedroom, kitchen. unit #101- bedroom and closet. approx 900 sf.Details
water loss, plaster walls and ceilings= selective demolition. demo scope available for affected reference. emergency services. unit #303- bathroom. unit #203- (2) closets, unit #201- bedroom, unit #103-bathroom, hallway, closet, bedroom, kitchen. unit #101- bedroom and closet. approx 900 sf. | $15,000 |