Back to bathroom remodel contractors
Bloemendal Construction**See Notes***
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Apr 2010
- Last 24 months
- 0 permits filed
37 permits since 2000: 29 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2010 | Completed final sign-off Aug 2010 | 2067 09th Av | remodel single family house. remove 1-post in 1st. flr. remodel house kitchen & bath. remodel stairs (replace handrail & guardrail).Details
remodel single family house. remove 1-post in 1st. flr. remodel house kitchen & bath. remodel stairs (replace handrail & guardrail). | $50,000 |
| Oct 3, 2008 | Completed final sign-off Mar 2009 | 2080 16th Av | 1st floor remodel: remodel toilet room & closet, refinish floors, replace lights fixtures. 2nd floor, remodel kitchen & powder room, (n) laundry at rear. 3rd floor, remodel master bathroom, refinish bedrooms.Details
1st floor remodel: remodel toilet room & closet, refinish floors, replace lights fixtures. 2nd floor, remodel kitchen & powder room, (n) laundry at rear. 3rd floor, remodel master bathroom, refinish bedrooms. | $25,000 |
| Aug 18, 2008 | Completed final sign-off Mar 2009 | 1545 47th Av | remodel existing bathroom & kitchen, upgrade electrical wiring.Details
remodel existing bathroom & kitchen, upgrade electrical wiring. | $20,000 |
| Jul 10, 2007 | Never finaled issued Jul 2007, no final | 41 Grattan St | revise 200408242410 adding work 2nd floor bathroom, remove/replace plumbing fixtures - tile work only, no walls one bathroom remodel no structural work (e) lighting to remain.Details
revise 200408242410 adding work 2nd floor bathroom, remove/replace plumbing fixtures - tile work only, no walls one bathroom remodel no structural work (e) lighting to remain. | $10,000 |
| Oct 21, 2005 | Completed final sign-off Dec 2005 | 215 Lansdale Av | lower one bathroom remodel new sink, shower, toilet, non structuralDetails
lower one bathroom remodel new sink, shower, toilet, non structural | $10,000 |