Back to bathroom remodel contractors
Block Nine Llc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Oct 2018
- Last 24 months
- 0 permits filed
11 permits since 2000: 6 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 2 never finaled. Typically 7 days from filing to permit and 875 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2018 | Completed final sign-off Jul 2020 | 639 18th Av | add condition space in garage with bathroom & laundry, infill lightwell @ 2nd floor, add bathroom @ 3rd floor, remove lath & plaster throughout & install new gypboard. pa#201711073375Details
add condition space in garage with bathroom & laundry, infill lightwell @ 2nd floor, add bathroom @ 3rd floor, remove lath & plaster throughout & install new gypboard. pa#201711073375 | $80,000 |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 639 18th Av | demo and remodel (2) bathrooms and (2) kitchens @ both units. (new cabinets, counter tops) upgrade electrical, panels; remove old ducting in garage; no alteration of wall, window and doorDetails
demo and remodel (2) bathrooms and (2) kitchens @ both units. (new cabinets, counter tops) upgrade electrical, panels; remove old ducting in garage; no alteration of wall, window and door | $65,000 |
| Nov 21, 2016 | Never finaled issued Dec 2016, no final | 734 09th Av | 1st fl: infill at rear, add 1 bath, 1 family room and laundry. 2nd and 3rd fl remodel kitchen and baths, add full bath each. new aluminum clad wood windows at front and enlarge doorDetails
1st fl: infill at rear, add 1 bath, 1 family room and laundry. 2nd and 3rd fl remodel kitchen and baths, add full bath each. new aluminum clad wood windows at front and enlarge door | $180,000 |