Back to bathroom remodel contractors
Bliss Construction A Partnership
- Based in
- El Granada
- On San Francisco permits
- Apr 2006 to Aug 2019
- Last 24 months
- 0 permits filed
26 permits since 2000: 22 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 never finaled. Typically 0 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 1, 2019 | Completed final sign-off Dec 2019 | 470 Liberty St | non structural int garage area: demo partition wall, 2 enclose parking w/hr wall. add bathroom, relocate laundry, add partition wall & door to (e) stairway, shearwall, insulate sheetrock ceiling & walls, - rerout plm to code and add necessary plugs, switches, etc. replace (e) windows , 1 new windowDetails
non structural int garage area: demo partition wall, 2 enclose parking w/hr wall. add bathroom, relocate laundry, add partition wall & door to (e) stairway, shearwall, insulate sheetrock ceiling & walls, - rerout plm to code and add necessary plugs, switches, etc. replace (e) windows , 1 new window | $35,000 |
| Jun 1, 2015 | Completed final sign-off Oct 2015 | 554 Mangels Av | remodel, demo existing 1/2 bath & wall between 2 existing utility rooms. relocate bathroom & launry room, add closet and 1 hr. wall between garage area.Details
remodel, demo existing 1/2 bath & wall between 2 existing utility rooms. relocate bathroom & launry room, add closet and 1 hr. wall between garage area. | $18,000 |
| Mar 2, 2015 | Completed final sign-off Mar 2015 | 258 Red Rock Wy | work in unit a: remove existing bathroom fixtures and replace with new fixtures - tile floor & tub surround. no new wall and no existing wall relocation. no plumbimg and electrical work will be altered.Details
work in unit a: remove existing bathroom fixtures and replace with new fixtures - tile floor & tub surround. no new wall and no existing wall relocation. no plumbimg and electrical work will be altered. | $3,000 |
| Jan 18, 2012 | Completed final sign-off Apr 2012 | 856 Clayton St | relocate extg bathroom and closet on extg on 3rd floor. no added sq footage. no change to bldg envelope. no exterior work. one new skylight.Details
relocate extg bathroom and closet on extg on 3rd floor. no added sq footage. no change to bldg envelope. no exterior work. one new skylight. | $20,000 |
| Jul 11, 2011 | Completed final sign-off Sep 2011 | 127 Eureka St | replace (e) fixtures with new fixtures. tile walls, paint. replace (e) window w/ new in (e) bathroom. window not visible from street, u-value =0.4 maxDetails
replace (e) fixtures with new fixtures. tile walls, paint. replace (e) window w/ new in (e) bathroom. window not visible from street, u-value =0.4 max | $5,300 |
| Oct 12, 2010 | Completed final sign-off Nov 2010 | 2344 34th Av | demo bathroom, sheetrock, tile, install fixtures, etc, no structural work replace in kind, no change in plumbing, no new lightingDetails
demo bathroom, sheetrock, tile, install fixtures, etc, no structural work replace in kind, no change in plumbing, no new lighting | $3,000 |
| Jul 13, 2010 | Completed final sign-off Nov 2010 | 140 Cresta Vista Dr | replace sheet rock in 2 bathrooms and replace fixtures with new fixtures in two bathroomsDetails
replace sheet rock in 2 bathrooms and replace fixtures with new fixtures in two bathrooms | $5,000 |
| Apr 16, 2007 | Never finaled issued Apr 2007, no final | 838 Page St | demo bathroom fixtures, tile, walls and ceiling. install shower pan, tile, new fixtures and sheetrock. fluorescent or controlled by motion sensor.Details
demo bathroom fixtures, tile, walls and ceiling. install shower pan, tile, new fixtures and sheetrock. fluorescent or controlled by motion sensor. | $8,000 |
| Jun 29, 2006 | Completed final sign-off Jan 2007 | 115 Corbett Av | replace an (e) plumbing & electrical fixture in kitchen & bathrooms, replce (e0 flooring in kitchen, dining & bathroom, fluorescent lightingDetails
replace an (e) plumbing & electrical fixture in kitchen & bathrooms, replce (e0 flooring in kitchen, dining & bathroom, fluorescent lighting | $20,000 |