Back to bathroom remodel contractors
Black & White Design/Builder
- Based in
- San Francisco
- On San Francisco permits
- Feb 2011 to Oct 2020
- Last 24 months
- 0 permits filed
4 permits since 2000: 1 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 95 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2011 | Completed final sign-off May 2011 | 84 Monterey Bl | update 2nd floor bathroom. new tub, new toilet, new vanity sink, re-tile floor and tub walls. new radiant floor heating.Details
update 2nd floor bathroom. new tub, new toilet, new vanity sink, re-tile floor and tub walls. new radiant floor heating. | $10,000 |