Bill Wong Construction
- Based in
- Brisbane
- On San Francisco permits
- Mar 2015 to Jun 2018
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 166 days from filing to permit and 183 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2018 | Completed final sign-off Jun 2019 | 722 South Van Ness Av | alt of (e) 2 story (e) childcare to convert 2/f (e) rear rooms to a single new class.convert (e) 2/f adult bathroom to a child restroom.add a 1/2 adult bathroom on 2/f. all new toilets wil be tank toilets.convert 2 basement floor valve toilets to tank tiolets and 1/f floor powder room...Details
alt of (e) 2 story (e) childcare to convert 2/f (e) rear rooms to a single new class.convert (e) 2/f adult bathroom to a child restroom.add a 1/2 adult bathroom on 2/f. all new toilets wil be tank toilets.convert 2 basement floor valve toilets to tank tiolets and 1/f floor powder room... | $7,500 |