Back to bathroom remodel contractors
Bill Walsh Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Sep 2025
- Last 24 months
- 1 permit filed
65 permits since 2000: 51 completed, 6 never finaled, 8 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 12 completed, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2014 | Never finaled issued Aug 2014, no final | 2125 Lawton St | remodel two existing bathrooms. install new plumbing & electrical. replace in kind. replace two milgard vinyl windows in lightwell. insulate all open cavaties. no change on walls and openings.Details
remodel two existing bathrooms. install new plumbing & electrical. replace in kind. replace two milgard vinyl windows in lightwell. insulate all open cavaties. no change on walls and openings. | $20,000 |
| Jan 8, 2014 | Never finaled issued Jan 2014, no final | 1526 12th Av | remodel extg full bath and half bath on 2nd floor. install new fixtures, tile, and lighting to code.Details
remodel extg full bath and half bath on 2nd floor. install new fixtures, tile, and lighting to code. | $12,000 |
| Sep 9, 2013 | Never finaled issued Sep 2013, no final | 1855 25th Av | infill rear north side for addition of full bath at 1/f and addition of a 1 hr. fire rated wall at garage to create a storage room.Details
infill rear north side for addition of full bath at 1/f and addition of a 1 hr. fire rated wall at garage to create a storage room. | $25,000 |
| Nov 5, 2012 | Completed final sign-off Jun 2013 | 86 Melba Av | remodel (2) existing bathrooms with new plumbing and electrical. model (1) existing kitchen with new plumbing and electrical. new lighting at bath(s) and kitchen. install exhaust fans at both bathrooms. instlal rangehood exhaust fan at kitchen.Details
remodel (2) existing bathrooms with new plumbing and electrical. model (1) existing kitchen with new plumbing and electrical. new lighting at bath(s) and kitchen. install exhaust fans at both bathrooms. instlal rangehood exhaust fan at kitchen. | $65,000 |
| Aug 16, 2012 | Never finaled issued Aug 2012, no final | 220 San Anselmo Av | remodel (e) bathroom at ground floor. upgrade electrical & plumbing. insulate open wall cavaties. re-tile shower. install linoleum flooring. install exhaust fan.Details
remodel (e) bathroom at ground floor. upgrade electrical & plumbing. insulate open wall cavaties. re-tile shower. install linoleum flooring. install exhaust fan. | $15,000 |
| Jun 19, 2012 | Completed final sign-off Jul 2012 | 2438 Fulton St | 2442: bathroom: remove tile at bath tub & walls. install synmar tub surround. install wood wainscoting 48" up walls re-finish tub.Details
2442: bathroom: remove tile at bath tub & walls. install synmar tub surround. install wood wainscoting 48" up walls re-finish tub. | $4,000 |
| Apr 1, 2011 | Completed final sign-off Oct 2013 | 2471 28th Av | re-tile existing bathroom.Details
re-tile existing bathroom. | $4,250 |
| Feb 4, 2011 | Completed final sign-off Feb 2012 | 2534 47th Av | vertical extension at two levels of 20 ft, width of 25 ft. extension iwll include 2 bedrooms, 2 bathrooms, and family room & 1/2 bath, laundry room / storage.Details
vertical extension at two levels of 20 ft, width of 25 ft. extension iwll include 2 bedrooms, 2 bathrooms, and family room & 1/2 bath, laundry room / storage. | $150,000 |
| Dec 8, 2010 | Completed final sign-off Jan 2012 | 128 Marietta Dr | build 1 full bathroom at ground floor level as per drawings, finish floors & walls to create family room. install 1 hr wall seperation between rooms & garage. install self closing 20min doors at garage. install smoke detectors & occupancy sensor switches at bathroomDetails
build 1 full bathroom at ground floor level as per drawings, finish floors & walls to create family room. install 1 hr wall seperation between rooms & garage. install self closing 20min doors at garage. install smoke detectors & occupancy sensor switches at bathroom | $20,000 |
| Apr 13, 2010 | Expired or cancelled expired Jan 2012 | 128 Marietta Dr | seismic strengthening at grnd flr: insulate all walls and ceilings; new electrical and plumbing service, shett-rock interior, remodel 1 bath, 1 kitchen @2nd flr only, correct framing as requested by bldg inspector, shear-ply 1/2" struc i plywood, remove illegal unit under separate permit, see attacDetails
seismic strengthening at grnd flr: insulate all walls and ceilings; new electrical and plumbing service, shett-rock interior, remodel 1 bath, 1 kitchen @2nd flr only, correct framing as requested by bldg inspector, shear-ply 1/2" struc i plywood, remove illegal unit under separate permit, see attac | $60,000 |
| Sep 22, 2009 | Completed final sign-off Feb 2010 | 12 Meadowbrook Dr | add family rm with full bath at garage level. insulate all floor and wall cavities. provide 1 hr wall separation at garage-living areas. install new 125 amp service, install new plumbing for bath,convienence sink and utility sinkDetails
add family rm with full bath at garage level. insulate all floor and wall cavities. provide 1 hr wall separation at garage-living areas. install new 125 amp service, install new plumbing for bath,convienence sink and utility sink | $20,000 |
| Jul 31, 2009 | Completed final sign-off Mar 2010 | 333 Naylor St | re-inforce foundation; new bathroom, bedroom, laundry room at garage-ground floor.Details
re-inforce foundation; new bathroom, bedroom, laundry room at garage-ground floor. | $80,000 |
| Feb 20, 2007 | Completed final sign-off Apr 2007 | 1726 39th Av | remodel (e) bathroom on main floor. no lighting change.Details
remodel (e) bathroom on main floor. no lighting change. | $10,000 |
| Apr 26, 2006 | Completed final sign-off Nov 2006 | 78 Melba Av | remodel (e) bathroom at top floor. no structural changes, no exterior work . resheetrock (e) bedroom. insullate all exterior/ceiling wall cavaties in affected area.Details
remodel (e) bathroom at top floor. no structural changes, no exterior work . resheetrock (e) bedroom. insullate all exterior/ceiling wall cavaties in affected area. | $10,000 |
| Mar 29, 2006 | Completed final sign-off Nov 2006 | 78 Melba Av | remodel existing kitchen and bathroom. no structural changes no exterior work in kind.Details
remodel existing kitchen and bathroom. no structural changes no exterior work in kind. | $30,000 |
| May 16, 2003 | Completed final sign-off Aug 2003 | 2039 09th Av | remodel existing bathrooms (2) one each unit, replace in kind. install new fixtures, exhaust fan,Details
remodel existing bathrooms (2) one each unit, replace in kind. install new fixtures, exhaust fan, | $14,000 |
| Nov 13, 2001 | Completed final sign-off Apr 2002 | 191 Beaumont Av | remodel bath, insulate wall,install tub, sink & toilet retile floors & walls upgrade eleDetails
remodel bath, insulate wall,install tub, sink & toilet retile floors & walls upgrade ele | $12,000 |