Bill's Construction Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Jun 2023
- Last 24 months
- 0 permits filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2023 | Completed final sign-off Nov 2023 | 2640 Great Hy | replace (4) windows at front, same size & location. u-factor 0.3. (n) windows aluminum clad wood. replace stucco at front. (approx. 250 sq ft)Details
replace (4) windows at front, same size & location. u-factor 0.3. (n) windows aluminum clad wood. replace stucco at front. (approx. 250 sq ft) | $30,000 |
| Mar 6, 2023 | Completed final sign-off Jun 2023 | 40 Forest View Dr | to comply with nov 202302228. legalize new driveway.Details
to comply with nov 202302228. legalize new driveway. | $8,000 |
| Jun 27, 2022 | Completed final sign-off May 2023 | 2630 Great Hy | to comply with complaint# 201892731, 201894051, 201979471. revision to pa# 202204061659. change shower stall to bath tub and revise other bathroom. all work at 2nd fl. sheet a3Details
to comply with complaint# 201892731, 201894051, 201979471. revision to pa# 202204061659. change shower stall to bath tub and revise other bathroom. all work at 2nd fl. sheet a3 | |
| Jun 27, 2022 | Completed final sign-off May 2023 | 2632 Great Hy | to comply with complaint# 201892731, 201894051, 201978471. revision to pa# 202107275212. change shower stall to bath tub and revise other bathroom. all work at 3nd fl (2632 great hwy). revise sheet a2Details
to comply with complaint# 201892731, 201894051, 201978471. revision to pa# 202107275212. change shower stall to bath tub and revise other bathroom. all work at 3nd fl (2632 great hwy). revise sheet a2 | |
| Jun 1, 2022 | Completed final sign-off May 2023 | 2630 Great Hy | re-stucco at front (approx. 320 sq ft). re-siding at rear (approx. 340 sq ft). replace (3) front window, clad wood in same opening.Details
re-stucco at front (approx. 320 sq ft). re-siding at rear (approx. 340 sq ft). replace (3) front window, clad wood in same opening. | $58,000 |
| Apr 6, 2022 | Completed final sign-off May 2023 | 2630 Great Hy | comply w/ complaint #201979471: remodel (e) kitchen, bathroom, add 1 new full bath & remove/replace (e) sheetrock w/ new at 2/f. construct 1 bedroom, family room, new bathroom, & hallway at g/f. repair interior staircase. wet bar.Details
comply w/ complaint #201979471: remodel (e) kitchen, bathroom, add 1 new full bath & remove/replace (e) sheetrock w/ new at 2/f. construct 1 bedroom, family room, new bathroom, & hallway at g/f. repair interior staircase. wet bar. | $120,000 |
| Jul 27, 2021 | Completed final sign-off May 2023 | 2632 Great Hy | comply w/ complaint #201937081 - remodel (e) kitchen & bathroom. add 1 new full bathroom. remove/replace (e) sheetrock w/ new. all work on 3rd floor.Details
comply w/ complaint #201937081 - remodel (e) kitchen & bathroom. add 1 new full bathroom. remove/replace (e) sheetrock w/ new. all work on 3rd floor. | $68,000 |
| Nov 12, 2020 | Completed final sign-off Jul 2021 | 1139 Bacon St | construct 2 bedroom, 1 bathroom, & laundry at g/f. remodel (e) bathroom, relocate (e) kitchen. add 1 new bathroom & replace (e) sheetrock w/ new at 2nd floor. construct new deck at rear of bldg (18' x 4'6"). in-fill (e) lightwell & install 4 skylights.Details
construct 2 bedroom, 1 bathroom, & laundry at g/f. remodel (e) bathroom, relocate (e) kitchen. add 1 new bathroom & replace (e) sheetrock w/ new at 2nd floor. construct new deck at rear of bldg (18' x 4'6"). in-fill (e) lightwell & install 4 skylights. | $90,000 |
| Jan 22, 2020 | Completed final sign-off Jun 2020 | 2214 39th Av | add $40,000 value to building app# 2019-0-29-0177Details
add $40,000 value to building app# 2019-0-29-0177 | $40,000 |
| Aug 29, 2019 | Completed final sign-off Jun 2020 | 2214 39th Av | 1)remodel extg bedroom and construct one full bath room at ground floor. 2) remodel extg kitchen, 2 bathroom at 2nd floor.Details
1)remodel extg bedroom and construct one full bath room at ground floor. 2) remodel extg kitchen, 2 bathroom at 2nd floor. | $58,000 |
| Sep 4, 2018 | Completed final sign-off Mar 2019 | 1375 Plymouth Av | revision to app#201802221922. deleted work in attic level and structural modification.Details
revision to app#201802221922. deleted work in attic level and structural modification. | |
| Feb 12, 2018 | Completed final sign-off Apr 2018 | 3320 Vicente St | remove and replace rot & damaged siding approx 300 sq. ft. at rear of building. also replace 7 windows at the rear of building in kind. u-factor <0.32. not visisble from streetDetails
remove and replace rot & damaged siding approx 300 sq. ft. at rear of building. also replace 7 windows at the rear of building in kind. u-factor <0.32. not visisble from street | $7,000 |
| Aug 28, 2017 | Completed final sign-off Feb 2018 | 61 Lapham Wy | alteration of extg ground fl, 1st and 2nd floors. install and alter bathrooms & install nw window. ground fl: convert ext half bath to full bath & install new window @ bth/bedrm 1st fl: convert extg kitchen to bedroom and bath, convert ext dinning room to kitchen & dinning,& replacment of windows.Details
alteration of extg ground fl, 1st and 2nd floors. install and alter bathrooms & install nw window. ground fl: convert ext half bath to full bath & install new window @ bth/bedrm 1st fl: convert extg kitchen to bedroom and bath, convert ext dinning room to kitchen & dinning,& replacment of windows. | $80,000 |
| Jun 9, 2015 | Completed final sign-off Nov 2015 | 666 Moultrie St | remove cement siding, keep (e) redwood siding, replace (e) guardrail w/new redwood guardrail at front of building & repair front stair in-kind.Details
remove cement siding, keep (e) redwood siding, replace (e) guardrail w/new redwood guardrail at front of building & repair front stair in-kind. | $20,000 |