Back to bathroom remodel contractors
Big Red Construction
- Based in
- Lafayette
- On San Francisco permits
- Feb 2014 to Feb 2014
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 4 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2014 | Completed final sign-off Aug 2014 | 3066 25th St | remodel consisting of removal of inteiror partitoins, relocation of kitchen & bathroom at 2nd floor, new bedroom, replacement of stair to attic, and new windows & sliding door @ rear of bldg. structural upgrades throughout house. comply w/san francisco building code attachment b, table 4.Details
remodel consisting of removal of inteiror partitoins, relocation of kitchen & bathroom at 2nd floor, new bedroom, replacement of stair to attic, and new windows & sliding door @ rear of bldg. structural upgrades throughout house. comply w/san francisco building code attachment b, table 4. | $105,000 |