Permit GraphShortlistSan Francisco building permits since 2000

Big 4 Construction

Contractor license
977406
State license record
Based in
San Francisco
On San Francisco permits
Aug 2014 to Oct 2025
Last 24 months
3 permits filed

17 permits since 2000: 13 completed, 1 in progress, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Bathroom remodel permits

AllDeck 2Stairs 1Kitchen remodel 8Bathroom remodel 7

7 bathroom remodel permits: 6 completed, 1 in progress. Typically 0 days from filing to permit and 125 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Oct 24, 2025In progress
issued Sep 2026
547 Edinburgh Stcomply with n.o.v. #201406261: 1/f reconfigure ground floor and legalize ground floor 2nd unit (ord.43-14). add 1-bedroom to main dwelling unit. 2/f convert (e) bathroom into study room and convert (e) closet into bathroom on 2nd flr. build wetbar to dining room.
Details
Permit
202510107242
Permit issued
Sep 9, 2026

comply with n.o.v. #201406261: 1/f reconfigure ground floor and legalize ground floor 2nd unit (ord.43-14). add 1-bedroom to main dwelling unit. 2/f convert (e) bathroom into study room and convert (e) closet into bathroom on 2nd flr. build wetbar to dining room.

Open the permit page

$200,000
Jan 23, 2025Completed
final sign-off May 2025
438 20th Avin kind (1) kitchen and (1) bath remodel. replace counter top, cabinets, sink, toilet, shower replace in kind
Details
Permit
202501238890
Permit issued
Jan 23, 2025
Final sign-off
May 2, 2025

in kind (1) kitchen and (1) bath remodel. replace counter top, cabinets, sink, toilet, shower replace in kind

Open the permit page

$25,000
Apr 6, 2023Completed
final sign-off Nov 2023
39 Lessing Stkithen and bathroom remodel (in kind). adding insulation on walls of ceiling. rewire electricity in house, no change for service panel or subpanel. repair and replae front windows and stucco at windows due to water damage. repair backyard fence (in kind) -25 linear ft - 6' tall.
Details
Permit
202304065203
Permit issued
Apr 6, 2023
Final sign-off
Nov 15, 2023

kithen and bathroom remodel (in kind). adding insulation on walls of ceiling. rewire electricity in house, no change for service panel or subpanel. repair and replae front windows and stucco at windows due to water damage. repair backyard fence (in kind) -25 linear ft - 6' tall.

Open the permit page

$35,000
Apr 29, 2022Completed
final sign-off Jun 2022
433 Excelsior Avkitchen & bathroom remodel on main floor/ replace existing ceiling light with 4 led lights/ replace exisitng laminated floor with engineered floor/ new interior painting & smooth out existing textured interior walls.
Details
Permit
202204293325
Permit issued
Apr 29, 2022
Final sign-off
Jun 17, 2022

kitchen & bathroom remodel on main floor/ replace existing ceiling light with 4 led lights/ replace exisitng laminated floor with engineered floor/ new interior painting & smooth out existing textured interior walls.

Open the permit page

$30,000
Nov 24, 2021Completed
final sign-off Apr 2022
230 Nueva Av2nd fl remodel of e kitchen and bath. enclose lightwell
Details
Permit
202111243096
Permit issued
Nov 29, 2021
Final sign-off
Apr 29, 2022

2nd fl remodel of e kitchen and bath. enclose lightwell

Open the permit page

$15,000
Jun 4, 2021Completed
final sign-off Sep 2021
2138 Quesada Avone kitchen and one bathroom remodel. adding gfci outlets in bathroom & kitchen counter space.. replace water fixtures. kitchen cabinets. adding led lights in kitchen and living space. upgrade existing 100 amp service panel to 200 amp.
Details
Permit
202106041654
Permit issued
Jun 4, 2021
Final sign-off
Sep 9, 2021

one kitchen and one bathroom remodel. adding gfci outlets in bathroom & kitchen counter space.. replace water fixtures. kitchen cabinets. adding led lights in kitchen and living space. upgrade existing 100 amp service panel to 200 amp.

Open the permit page

$25,000
Apr 24, 2018Completed
final sign-off Sep 2020
74 Sears Stcomply w/ nov# 201846688. unit legalization per ord# 43-14 w/ kitchen, bedroom, three bathrooms and living rm @ ground fl.
Details
Permit
201804247175
Permit issued
Mar 11, 2019
Final sign-off
Sep 22, 2020

comply w/ nov# 201846688. unit legalization per ord# 43-14 w/ kitchen, bedroom, three bathrooms and living rm @ ground fl.

Open the permit page

$52,000
Big 4 Construction, contractor license 977406 | Permit Graph