Back to bathroom remodel contractors
Big 4 Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to Oct 2025
- Last 24 months
- 3 permits filed
17 permits since 2000: 13 completed, 1 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 in progress. Typically 0 days from filing to permit and 125 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 24, 2025 | In progress issued Sep 2026 | 547 Edinburgh St | comply with n.o.v. #201406261: 1/f reconfigure ground floor and legalize ground floor 2nd unit (ord.43-14). add 1-bedroom to main dwelling unit. 2/f convert (e) bathroom into study room and convert (e) closet into bathroom on 2nd flr. build wetbar to dining room.Details
comply with n.o.v. #201406261: 1/f reconfigure ground floor and legalize ground floor 2nd unit (ord.43-14). add 1-bedroom to main dwelling unit. 2/f convert (e) bathroom into study room and convert (e) closet into bathroom on 2nd flr. build wetbar to dining room. | $200,000 |
| Jan 23, 2025 | Completed final sign-off May 2025 | 438 20th Av | in kind (1) kitchen and (1) bath remodel. replace counter top, cabinets, sink, toilet, shower replace in kindDetails
in kind (1) kitchen and (1) bath remodel. replace counter top, cabinets, sink, toilet, shower replace in kind | $25,000 |
| Apr 6, 2023 | Completed final sign-off Nov 2023 | 39 Lessing St | kithen and bathroom remodel (in kind). adding insulation on walls of ceiling. rewire electricity in house, no change for service panel or subpanel. repair and replae front windows and stucco at windows due to water damage. repair backyard fence (in kind) -25 linear ft - 6' tall.Details
kithen and bathroom remodel (in kind). adding insulation on walls of ceiling. rewire electricity in house, no change for service panel or subpanel. repair and replae front windows and stucco at windows due to water damage. repair backyard fence (in kind) -25 linear ft - 6' tall. | $35,000 |
| Apr 29, 2022 | Completed final sign-off Jun 2022 | 433 Excelsior Av | kitchen & bathroom remodel on main floor/ replace existing ceiling light with 4 led lights/ replace exisitng laminated floor with engineered floor/ new interior painting & smooth out existing textured interior walls.Details
kitchen & bathroom remodel on main floor/ replace existing ceiling light with 4 led lights/ replace exisitng laminated floor with engineered floor/ new interior painting & smooth out existing textured interior walls. | $30,000 |
| Nov 24, 2021 | Completed final sign-off Apr 2022 | 230 Nueva Av | 2nd fl remodel of e kitchen and bath. enclose lightwellDetails
2nd fl remodel of e kitchen and bath. enclose lightwell | $15,000 |
| Jun 4, 2021 | Completed final sign-off Sep 2021 | 2138 Quesada Av | one kitchen and one bathroom remodel. adding gfci outlets in bathroom & kitchen counter space.. replace water fixtures. kitchen cabinets. adding led lights in kitchen and living space. upgrade existing 100 amp service panel to 200 amp.Details
one kitchen and one bathroom remodel. adding gfci outlets in bathroom & kitchen counter space.. replace water fixtures. kitchen cabinets. adding led lights in kitchen and living space. upgrade existing 100 amp service panel to 200 amp. | $25,000 |
| Apr 24, 2018 | Completed final sign-off Sep 2020 | 74 Sears St | comply w/ nov# 201846688. unit legalization per ord# 43-14 w/ kitchen, bedroom, three bathrooms and living rm @ ground fl.Details
comply w/ nov# 201846688. unit legalization per ord# 43-14 w/ kitchen, bedroom, three bathrooms and living rm @ ground fl. | $52,000 |