Beyond House Maintenance
- Based in
- Daly City
- On San Francisco permits
- Jan 2014 to Jul 2021
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2021 | Completed final sign-off Aug 2022 | 215 Vasquez Av | to renewa bpa#8912589 for final inspection. all work complete.Details
to renewa bpa#8912589 for final inspection. all work complete. | |
| Dec 31, 2018 | Completed final sign-off Apr 2019 | 2178 17th Av | remove damaged driveway and concrete in front of house. pour new concrete and install two lines of bricks to driveway.Details
remove damaged driveway and concrete in front of house. pour new concrete and install two lines of bricks to driveway. | $4,000 |
| Apr 23, 2015 | Completed final sign-off Jan 2016 | 257 Brentwood Av | change large walk-in closet to full bathroom in master bedroom.Details
change large walk-in closet to full bathroom in master bedroom. | $50,000 |
| Oct 8, 2014 | Completed final sign-off Apr 2015 | 1580 15th Av | 1 e kitchen remodel on the 2nd fl per plan. 1) window replacement in the kitchenDetails
1 e kitchen remodel on the 2nd fl per plan. 1) window replacement in the kitchen | $5,000 |
| Apr 1, 2014 | Completed final sign-off Aug 2014 | 1491 40th Av | remodel kitchen & bath, upgrade electrical panel, replace water heater & furnace, upgrade copper pipe throughout house up to water miter.Details
remodel kitchen & bath, upgrade electrical panel, replace water heater & furnace, upgrade copper pipe throughout house up to water miter. | $24,000 |
| Jan 3, 2014 | Completed final sign-off Dec 2014 | 20 Victoria St | remodel (e) kitchen at 2nd floor and comply with complaint # 201334464 & # 201334461.Details
remodel (e) kitchen at 2nd floor and comply with complaint # 201334464 & # 201334461. | $5,000 |