Better Earth Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Sep 2024
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2024 | Completed final sign-off Dec 2024 | 1270 Sanchez St | two to four sheets of wood siding (t11) have some dry rot and need to replaced. separte permit for scaffolding will be obtained later.Details
two to four sheets of wood siding (t11) have some dry rot and need to replaced. separte permit for scaffolding will be obtained later. | $20,000 |
| May 20, 2024 | Completed final sign-off Jun 2024 | 673 San Jose Av | install metal security gate located at exterior front door. not visable from street.Details
install metal security gate located at exterior front door. not visable from street. | $5,200 |
| Jun 22, 2009 | Completed final sign-off Sep 2009 | 44 Nevada St | install tankless water and associated vent system, connect gas line to tankless, connect tankless to forced air hydronic, patch walls, etc, connect to electricalDetails
install tankless water and associated vent system, connect gas line to tankless, connect tankless to forced air hydronic, patch walls, etc, connect to electrical | $5,400 |