Back to bathroom remodel contractors
Best Level Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2017 to Sep 2026
- Last 24 months
- 5 permits filed
22 permits since 2000: 19 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 10 completed, 1 in progress, 1 never finaled. Typically 1 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Oct 2026 | 826 38th Av | 1st floor: add 1 bedroom , 2 full bath, den and family room. 2nd floor: remodel kitchen and bathroom ad 1.5 bath, infill lightwell, infill at rear, replace all front windows with in-kind vinyl. all electric ab-112 required.Details
1st floor: add 1 bedroom , 2 full bath, den and family room. 2nd floor: remodel kitchen and bathroom ad 1.5 bath, infill lightwell, infill at rear, replace all front windows with in-kind vinyl. all electric ab-112 required. | $180,000 |
| Nov 13, 2025 | Completed final sign-off Mar 2026 | 219 Lisbon St | remodel master bathroom and closet at 2nd flr per plan.Details
remodel master bathroom and closet at 2nd flr per plan. | $23,600 |
| Apr 17, 2024 | Completed final sign-off May 2025 | 78 Niagara Av | 2nd fl: remodel (e) kitchen & bathroom & add (1) new bedroom & bathroom. remove (e) stair to the ground floor. replace (e) street facing windows inkind. ground fl: add (n) family room, one full bath & bedroom. relocate (e) water heater & furnace. add kitcheneteDetails
2nd fl: remodel (e) kitchen & bathroom & add (1) new bedroom & bathroom. remove (e) stair to the ground floor. replace (e) street facing windows inkind. ground fl: add (n) family room, one full bath & bedroom. relocate (e) water heater & furnace. add kitchenete | $120,000 |
| Feb 23, 2023 | Completed final sign-off Aug 2023 | 1714 Cabrillo St | unit #b: remodel kitchen and bathroom in kind. kitchen on ground floor and 2nd floor bathroon on ground floor and 2 bathroom on 2nd floor. no removal of walls.Details
unit #b: remodel kitchen and bathroom in kind. kitchen on ground floor and 2nd floor bathroon on ground floor and 2 bathroom on 2nd floor. no removal of walls. | $65,000 |
| Sep 14, 2022 | Completed final sign-off Feb 2023 | 157 Julian Av | unit #157-b: remodel 1 kitchen and 1 bathroom in kind. non structural.Details
unit #157-b: remodel 1 kitchen and 1 bathroom in kind. non structural. | $30,000 |
| Mar 2, 2022 | Never finaled issued Mar 2022, no final | 132 Clinton Pk | unit 3: remodel one kitchen and one existing bathroom. re-paint entire unit. no structural workDetails
unit 3: remodel one kitchen and one existing bathroom. re-paint entire unit. no structural work | $38,000 |
| Oct 12, 2021 | Completed final sign-off Sep 2022 | 1274 18th Av | remodel one existing bathroom in kind. no alteration of wall, window and door.Details
remodel one existing bathroom in kind. no alteration of wall, window and door. | $5,800 |
| Oct 12, 2021 | Completed final sign-off Sep 2022 | 1272 18th Av | remodel one existing kitchen and one existing bathroom in kind. no alteration of wall, window and door.Details
remodel one existing kitchen and one existing bathroom in kind. no alteration of wall, window and door. | $14,800 |
| Jul 7, 2021 | Completed final sign-off Oct 2021 | 3590 21st St | unit 201: remodel (e) kitchen in kind- remodel two (e) bathrooms in kind. re-piant entire unit.Details
unit 201: remodel (e) kitchen in kind- remodel two (e) bathrooms in kind. re-piant entire unit. | $50,000 |
| Feb 1, 2019 | Completed final sign-off Dec 2019 | 153 Julian Av | remodel unit # 153 & 159 on second floor. convert living room to bedroom, convert closet to office. remodel kitchen and bathroom.Details
remodel unit # 153 & 159 on second floor. convert living room to bedroom, convert closet to office. remodel kitchen and bathroom. | $25,000 |
| Dec 6, 2018 | Completed final sign-off May 2019 | 505 26th Av | remodel 1 kitchen, 2 bathrooms & 2 bedrooms in-kind. new cabinets, countertops & plumbing as needed. no structural work for unit#1 only. no work in common area, no change in floor plan layout.Details
remodel 1 kitchen, 2 bathrooms & 2 bedrooms in-kind. new cabinets, countertops & plumbing as needed. no structural work for unit#1 only. no work in common area, no change in floor plan layout. | $40,000 |
| Mar 21, 2017 | Completed final sign-off Apr 2021 | 1300 Masonic Av | addition of 1 new unit on ground floor per ordinance# 162-16. new unit with 1 living room, 1 bedrooms, 1 office, 1 kitchen, 1 bathroom.Details
addition of 1 new unit on ground floor per ordinance# 162-16. new unit with 1 living room, 1 bedrooms, 1 office, 1 kitchen, 1 bathroom. | $25,000 |