Back to bathroom remodel contractors
Best Forever Construction Company
- Based in
- Dublin
- On San Francisco permits
- Sep 2016 to Oct 2022
- Last 24 months
- 0 permits filed
16 permits since 2000: 12 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 expired or cancelled. Typically 18 days from filing to permit and 208 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2020 | Completed final sign-off Jun 2021 | 265 Lee Av | unit 267 2nd flr: add 1 full bathroom, remodel (e) kitchen and bathroom, replace bathtub with shower. replace all windows. unit 265 1st flr: reconfiguration of existing unit from 1 bedroom, 1 full bathroom to 2 bedrooms, 2 full bathrooms. replace all windows, water heater & furnace.Details
unit 267 2nd flr: add 1 full bathroom, remodel (e) kitchen and bathroom, replace bathtub with shower. replace all windows. unit 265 1st flr: reconfiguration of existing unit from 1 bedroom, 1 full bathroom to 2 bedrooms, 2 full bathrooms. replace all windows, water heater & furnace. | $110,000 |
| Dec 9, 2019 | Expired or cancelled expired Jan 2025 | 132 Valmar Tr | to comply with complaint #201905058. interior finishing within building envelope. finish lighting, plbg, fixtures, trims, baseboard, switches, flooring, repainting. refinish backyard deck. fix concrete pavement for backyard, kitchen and bathroom remodel. new tiles and wall.Details
to comply with complaint #201905058. interior finishing within building envelope. finish lighting, plbg, fixtures, trims, baseboard, switches, flooring, repainting. refinish backyard deck. fix concrete pavement for backyard, kitchen and bathroom remodel. new tiles and wall. | $40,000 |
| Jun 27, 2019 | Completed final sign-off Jun 2020 | 1042 Divisadero St | remodel 3 bathrooms & add new bathroom; replace existing kitchen cabinet; install smoke detectors; install gas shut off valve; modify mep as neededDetails
remodel 3 bathrooms & add new bathroom; replace existing kitchen cabinet; install smoke detectors; install gas shut off valve; modify mep as needed | $38,000 |
| Nov 2, 2018 | Completed final sign-off Jan 2019 | 1730 Pacheco St | convert 1 full bathroom and 1/2 bathroom to 2 full bathroomsDetails
convert 1 full bathroom and 1/2 bathroom to 2 full bathrooms | $10,000 |
| Jul 25, 2017 | Completed final sign-off Mar 2018 | 265 Hester Av | 1st fl: relocate bath, convert storage to office and media, and two alum slider windows and wood door on first floor, rear only. (n) wd siding to match (e) wd sidings. - patchwork only.Details
1st fl: relocate bath, convert storage to office and media, and two alum slider windows and wood door on first floor, rear only. (n) wd siding to match (e) wd sidings. - patchwork only. | $60,000 |
| Feb 24, 2017 | Completed final sign-off Dec 2017 | 1522 19th Av | remodel (e) kitchen, bathroom & add one new bathroom at 2nd floor. legalize two bedrooms, office, laundry & two full bathroom at ground floor. n/a maher ordinanceDetails
remodel (e) kitchen, bathroom & add one new bathroom at 2nd floor. legalize two bedrooms, office, laundry & two full bathroom at ground floor. n/a maher ordinance | $72,000 |