Back to bathroom remodel contractors
Best & Builidng Construction Inc
- Based in
- Stockton
- On San Francisco permits
- Jul 2019 to Sep 2020
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 149 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2020 | Completed final sign-off Aug 2022 | 2215 41st Av | 1st fl: add family room, bedroom, bath & foyer (695 sf). 2nd fl: infill (e) lightwell (84 sf). horiz addition. relocate (e) living, dining, kitchen & bedroom. add master bath. add 19'x7' rear deck. roof: add 6 & remain 2 skylights. add 16x30 lhr fr parapet on north side.Details
1st fl: add family room, bedroom, bath & foyer (695 sf). 2nd fl: infill (e) lightwell (84 sf). horiz addition. relocate (e) living, dining, kitchen & bedroom. add master bath. add 19'x7' rear deck. roof: add 6 & remain 2 skylights. add 16x30 lhr fr parapet on north side. | $80,000 |
| Jul 10, 2019 | Completed final sign-off May 2020 | 2239 42nd Av | renovation of (e) sfd. remodel (e) kitchen & bathroom and add master bathroom on 2/f. remove load-bearing wall & replace sheetrock on 2/f. add 3 skylights, add 1-hr fire rated parapet on the south side. repair stucco and stud at facade.Details
renovation of (e) sfd. remodel (e) kitchen & bathroom and add master bathroom on 2/f. remove load-bearing wall & replace sheetrock on 2/f. add 3 skylights, add 1-hr fire rated parapet on the south side. repair stucco and stud at facade. | $80,000 |