Back to bathroom remodel contractors
Bernhardt Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Jan 2015 to Aug 2025
- Last 24 months
- 1 permit filed
19 permits since 2000: 16 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2022 | Completed final sign-off Nov 2022 | 206 Ordway St | refixturing of kitchen + bathroom using same layouts. in-kind.Details
refixturing of kitchen + bathroom using same layouts. in-kind. | $20,000 |
| Mar 16, 2021 | Completed final sign-off Aug 2021 | 138 Monterey Bl | minor interior remodel at extg ground floor. add new half bathroom for convenience use for guest. no demolition work included.Details
minor interior remodel at extg ground floor. add new half bathroom for convenience use for guest. no demolition work included. | $12,000 |
| Jan 5, 2021 | Completed final sign-off Mar 2021 | 138 Monterey Bl | bathroom refixturing. new tub, sink, toilet, and tile. no moving of fixturs to new locations.Details
bathroom refixturing. new tub, sink, toilet, and tile. no moving of fixturs to new locations. | $5,000 |
| Feb 28, 2019 | Completed final sign-off Aug 2019 | 210 Texas St | bathroom remodel, interio partitions changes, fenstration changes at rear and east elevationDetails
bathroom remodel, interio partitions changes, fenstration changes at rear and east elevation | $20,000 |
| Apr 25, 2016 | Completed final sign-off Nov 2016 | 2946 Pine St | remodel 2nd upstairs bathroom, plumbing, electrical, tile ,re-fixture.Details
remodel 2nd upstairs bathroom, plumbing, electrical, tile ,re-fixture. | $12,000 |
| Jan 13, 2015 | Completed final sign-off Nov 2016 | 2946 Pine St | demo (one) existing guest bathroom. refixturing with new toilet, shower, sink, loights and switches. sheetrock and tile.Details
demo (one) existing guest bathroom. refixturing with new toilet, shower, sink, loights and switches. sheetrock and tile. | $15,000 |