Back to bathroom remodel contractors
Bergland Construction
- Based in
- Sonora
- On San Francisco permits
- Mar 2006 to Jun 2014
- Last 24 months
- 0 permits filed
11 permits since 2000: 11 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 6 days from filing to permit and 280 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2011 | Completed final sign-off Feb 2013 | 273 Molimo Dr | 2 story addition - extend rear of bldg 10' horizontally, add (n) bath, (n) bedroom, replace furnace, 3 (n) wood windows in front, same size.Details
2 story addition - extend rear of bldg 10' horizontally, add (n) bath, (n) bedroom, replace furnace, 3 (n) wood windows in front, same size. | $103,000 |
| Jan 28, 2011 | Completed final sign-off Nov 2012 | 273 Molimo Dr | kitchen & bathroom remodeling. new copper pipes to street meter.Details
kitchen & bathroom remodeling. new copper pipes to street meter. | $30,000 |
| Nov 17, 2010 | Completed final sign-off Jul 2011 | 224 Nevada St | demo e porch and stairs and replace with deck and stairs. install patio door at e windows, replace bath window, fill below, new tile shower surround and new tub valve, 1 elec switch at new patio door.Details
demo e porch and stairs and replace with deck and stairs. install patio door at e windows, replace bath window, fill below, new tile shower surround and new tub valve, 1 elec switch at new patio door. | $9,000 |
| Mar 1, 2006 | Completed final sign-off Aug 2006 | 6509 Geary Bl | complete demo of bathroom & remodel demo kitchen cabinets,flooring and replace. install new 15 amp circuit to disposal.no moving walls or openings.extend gas line to stove.Details
complete demo of bathroom & remodel demo kitchen cabinets,flooring and replace. install new 15 amp circuit to disposal.no moving walls or openings.extend gas line to stove. | $39,000 |