Benjamin Shaw
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Sep 2026
- Last 24 months
- 3 permits filed
82 permits since 2000: 73 completed, 2 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
5 deck permits: 5 completed. Typically 174 days from filing to permit and 352 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2021 | Completed final sign-off Apr 2022 | 1342 Shotwell St | amend permit #202011199283: concrete slab in garden. deck under 30". replace skylights. minor adjustments to non-bearing interior walls.Details
amend permit #202011199283: concrete slab in garden. deck under 30". replace skylights. minor adjustments to non-bearing interior walls. | |
| Nov 9, 2021 | Completed final sign-off Aug 2024 | 550 Lansdale Av | remodel kitchen for better layout, including removing existing spiral staircase for more cabinetry/countertops, removing partition from dining room for new peninsula, and closing up hallway access to add storage. addition of small deck and steps to grade near bedroom and a new patio in the backyard.Details
remodel kitchen for better layout, including removing existing spiral staircase for more cabinetry/countertops, removing partition from dining room for new peninsula, and closing up hallway access to add storage. addition of small deck and steps to grade near bedroom and a new patio in the backyard. | $36,630 |
| Apr 27, 2018 | Completed final sign-off Mar 2021 | 75 Valley St | partial demo and rebuild rear 12 ft of bldg to add ground fl living space & a 2nd story kitchen & exterior deck. ground unit interior demolish & rebuild unit, add additional bath. second fl unit: demolish and rebuild existing kitchenDetails
partial demo and rebuild rear 12 ft of bldg to add ground fl living space & a 2nd story kitchen & exterior deck. ground unit interior demolish & rebuild unit, add additional bath. second fl unit: demolish and rebuild existing kitchen | $150,000 |
| Nov 29, 2006 | Completed final sign-off Oct 2008 | 330 Duncan St | horizontal addition - 1 story addition in rear yard with deck above addition.Details
horizontal addition - 1 story addition in rear yard with deck above addition. | $200,000 |
| Sep 5, 2001 | Completed final sign-off Dec 2001 | 1238 Church St | new deck at existing roof. roof structure designed for deck under 980653751-s1.Details
new deck at existing roof. roof structure designed for deck under 980653751-s1. | $3,000 |