Back to bathroom remodel contractors
Belvoir Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2016 to Sep 2026
- Last 24 months
- 7 permits filed
25 permits since 2000: 19 completed, 1 in progress, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 12 completed, 1 in progress, 2 expired or cancelled. Typically 2 days from filing to permit and 125 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 68 Dawnview Wy | interior remodel of 2nd level kitchen, dining room, living room,(2)baths and (3) bedrooms. new windows & doors throughout 2nd level. new rear deck & spiral stairs to rear year.structural,mech,plumbing & electrical work corresponding to proposed scope of work.Details
interior remodel of 2nd level kitchen, dining room, living room,(2)baths and (3) bedrooms. new windows & doors throughout 2nd level. new rear deck & spiral stairs to rear year.structural,mech,plumbing & electrical work corresponding to proposed scope of work. | $375,000 |
| Aug 6, 2026 | Completed final sign-off Aug 2026 | 33 Castle St | lower unit-kitchen and bathroom remodel to include replace sheetrock, kitchen cabinets, and bathroom fixtures and finishes due to water damage. all work is like for like with no wall removal.Details
lower unit-kitchen and bathroom remodel to include replace sheetrock, kitchen cabinets, and bathroom fixtures and finishes due to water damage. all work is like for like with no wall removal. | $25,000 |
| Jul 1, 2024 | Completed final sign-off Oct 2024 | 1908 Steiner St | remodel (e) bathroom & kitchen. plumbing & electrical work in remodeled areasDetails
remodel (e) bathroom & kitchen. plumbing & electrical work in remodeled areas | $35,000 |
| May 21, 2024 | Completed final sign-off Aug 2024 | 1478 Guerrero St | remodel 2 baths at 3rd fl, minor interior wall reconfigureation at 1 bathroomDetails
remodel 2 baths at 3rd fl, minor interior wall reconfigureation at 1 bathroom | $60,000 |
| May 2, 2024 | Completed final sign-off Aug 2024 | 1478 Guerrero St | partial demo for structural purposes. rought 10sqft. opening up walls in bathroom and bedroom and dining room. 8 holes of 16 square inches.Details
partial demo for structural purposes. rought 10sqft. opening up walls in bathroom and bedroom and dining room. 8 holes of 16 square inches. | $100 |
| Apr 22, 2024 | Completed final sign-off Apr 2025 | 36 Elsie St | remodel bath on 2nd fl of residence. replace front windows on 2nd fl of residence. new lighting 2nd fl, plumbing work in bathDetails
remodel bath on 2nd fl of residence. replace front windows on 2nd fl of residence. new lighting 2nd fl, plumbing work in bath | $19,000 |
| Jan 11, 2024 | Expired or cancelled expired Feb 2026 | 1612 Vallejo St | revise permit# 202208251289: to include kitchen remodel at 2nd floor and remodel bath to remove shower to become powder room. revise plan at 3rd floor bath, closets and bedroom. revise sheawall location.Details
revise permit# 202208251289: to include kitchen remodel at 2nd floor and remodel bath to remove shower to become powder room. revise plan at 3rd floor bath, closets and bedroom. revise sheawall location. | $60,000 |
| Nov 10, 2023 | Completed final sign-off Mar 2024 | 1906 Steiner St | interior bathroom and kitchen remodel (64 sf)Details
interior bathroom and kitchen remodel (64 sf) | $30,000 |
| Aug 7, 2023 | Completed final sign-off Sep 2023 | 71 Gaviota Wy | revision to pa# 202209283309, to include reconfiguratioin of 2nd flr bathroom, remove fireplace @ front room, remove decorative metal at front windows. (n) siding at rear, (n) windows @ 2nd flr bedroom. (n) subflr & framing @ 1st flr.Details
revision to pa# 202209283309, to include reconfiguratioin of 2nd flr bathroom, remove fireplace @ front room, remove decorative metal at front windows. (n) siding at rear, (n) windows @ 2nd flr bedroom. (n) subflr & framing @ 1st flr. | $9,500 |
| Jul 13, 2023 | Completed final sign-off Feb 2024 | 819 Grove St | remodel primary bathroom, reconfigure primary closet, relocate laundry closet. elect and plumbing work in bathroom and laundry closetDetails
remodel primary bathroom, reconfigure primary closet, relocate laundry closet. elect and plumbing work in bathroom and laundry closet | $20,000 |
| Jan 27, 2023 | Completed final sign-off Dec 2023 | 36 Elsie St | 1/f: convert 38 sq.ft. to habitable space. remodel (e) bathroom. replace door and windows in rear of residence. reconfigure storage and laundry area in (e) garage. replace water heater with tankless water heater in garage. new furnace in garage.Details
1/f: convert 38 sq.ft. to habitable space. remodel (e) bathroom. replace door and windows in rear of residence. reconfigure storage and laundry area in (e) garage. replace water heater with tankless water heater in garage. new furnace in garage. | $70,000 |
| Apr 15, 2022 | Completed final sign-off Nov 2022 | 1465 06th Av | construct bedroom & bath within (e) unimproved basement, and adjacent wood deck at grade. remove (e) wood stair & deck at rear of 1st story. construct (n) wooden deck at rear with (n) wood stair. (n) french door and window at rear.Details
construct bedroom & bath within (e) unimproved basement, and adjacent wood deck at grade. remove (e) wood stair & deck at rear of 1st story. construct (n) wooden deck at rear with (n) wood stair. (n) french door and window at rear. | $69,500 |
| Dec 8, 2021 | Completed final sign-off Dec 2022 | 324 Highland Av | (n) bath on 3rd fl, add 20 sf for (n) bathroom. (n) domer addition over (n) bathroom, recondifure closet in (e) bedrooms. (n) plumbing and electric in (n) bathDetails
(n) bath on 3rd fl, add 20 sf for (n) bathroom. (n) domer addition over (n) bathroom, recondifure closet in (e) bedrooms. (n) plumbing and electric in (n) bath | $20,000 |
| Sep 19, 2017 | Completed final sign-off Jan 2018 | 2950 Clay St | unit 303: remodel (2) bathrooms in-kind.Details
unit 303: remodel (2) bathrooms in-kind. | $17,000 |
| Feb 6, 2017 | Expired or cancelled expired May 2024 | 740 Shotwell St | exploratory demo, open up two walk in kitchen & bathroom.Details
exploratory demo, open up two walk in kitchen & bathroom. | $1,500 |