Bejarano Construction 9inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2018 to Oct 2026
- Last 24 months
- 15 permits filed
40 permits since 2000: 18 completed, 13 in progress, 3 never finaled, 6 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Deck permits
1 deck permit: 1 expired or cancelled. Typically 32 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2024 | Expired or cancelled cancelled Apr 2025 | 1100 Holloway Av | 1st fl: installation of 1 window on each side of building. 2nd fl: 2 cantilevered decks. 1 dec at front of building. one deck on south side of building. installation of 2 skylights. 1 in kitchen area one in hallway.Details
1st fl: installation of 1 window on each side of building. 2nd fl: 2 cantilevered decks. 1 dec at front of building. one deck on south side of building. installation of 2 skylights. 1 in kitchen area one in hallway. | $80,000 |